LTMB24-X4-RK

Installation Instructions

LT MB24 4 Wide Rigging Kit Grid

Thank you for choosing the LTMB24-X4-RK
Grid. This grid suspends 4 BOSE LT MB24-III
speakers in 4 sequential arrangements.

Important: Rigging overhead system requires
professional experience. Improperly installed

equipment can result in property damage,

personal injury, death and/or liability to the
installing contractor.
Do not suspend if in
doubt about the integrity of the structure.

Caution: Due to the wide variety of structures,
environments, materials and rigging methods,
the installing contractor should exercise good
judgment in selecting the proper mounting area
and hardware.

Follow these instructions for the most

efficient and safest rigging results. .Do not

exceed the working load limit of

1200 lbs/545 Kg.

Package Contents:
1 pcs. LTMB24-X4-RK GRID
1 pc.

Instruction sheet, 8.5X11

16 pcs Hex Cap, 3/8-16x1.5,G8, blk
16 pcs. Split washer, 3/8, G8, blk
16 pcs. Flat washer, 3/8”, SAE

Step 1:
Check to make sure the holes of the grid matches the
holes on top and bottom of the speaker. Remove and
discard speaker screws where the grid will be attached

Step 2:
Set three speakers on the clean or padded floor with
the front facing the same direction. Lay the grid over
the top of the speakers and match the holes to the
holes on the speaker. Attach grid to speakers using the
supplied 3/8 hex bolt, washer and split washers.
Tighten bolts permanently (Figure 1).

Step 3:
Attach load rated suspension cables to the suspension
bracket on the four corners of the grid using load rated
hardware such as shackles (Figure 2). One can use
eight cable suspension points or eight points bridled to
a four point suspension (Figure 2).

Step 4:
Check all connections before suspending the speaker cluster.