Blue Sky Solar Boost 3024Di User Manual

Page 2

Advertising
background image

Network connection and power for the display are provided by the Solar Boost 3024i using the short telephone cable supplied. The

cable should connect between the IPN Display connector on the Solar Boost 3024i main circuit board and the IPN Network connector
on the display circuit board.

¾

Note that standard 4-pin telephone cables swap pin numbers end-to-end. This end-to-end pin swap is

required for the display to operate properly. If cables are custom terminated or cable couplers are used,
be certain the pin swap is maintained as shown below.

Troubleshooting Guide

SYMPTOM

PROBABLE CAUSE

ITEMS TO EXAMINE OR CORRECT

Completely dead, no
display

No power

Charge controller not properly powered

Cable faulty, not plugged in or cable pins do not swap

Display turns on, but
battery voltage displays
“– – –“ rather than a
number

Display not communicating with
charge controller

Cable faulty

One charge controller is not set to be Master, or more than
one charge controller is set to be Master

One or more charge controllers on network has open Bat –
connection preventing communication

When charger turns on,
output current displays
“– – –“ rather than a
number

Output current display selection
set for an address not present on
the IPN network

Configure display IPN network address DIP switch to properly
read output current of a charger present on the IPN network

When charger turns on,
output current displays
but the value seems
incorrect

Output current display selection
set for wrong IPN network
address

Bat– connected to PV– outside
charge controller

Configure display IPN network address DIP switch to properly
read output current of a charger present on the IPN network

Some charge controllers require Bat– not be connected to PV–
outside charge controller, see charge controller manual.

Voltage or current value
seems to be stuck and
does not change

Display or charge controller IPN
network addressed changed

Display lost communication link
with charge controller

Configure display IPN network address DIP switch to properly
read output current of a charger present on the IPN network

Intermittent faulty display cable

Blue Sky Energy, Inc.

2598 Fortune Way, Suite K

Vista, CA, 92081, USA

800-493-7877

•••• 760-597-1642 •••• Fax 760-597-1731 •••• www.blueskyenergyinc.com



Advertising