Model a & model a 18 model g & model g 18 model qb – Brookfield Lab Stand User Manual

Page 2

Advertising
background image

Model A & Model A 18 Model G & Model G 18

Model QB

Model A Lab Stand - Comes with 14” rod

(VS-CRA-14S). Used with Dial and DV-E

viscometers.

Model A 18 Lab Stand - Comes with 18”

rod (VS-CRA-18S). Optional choice when

additional height is required.

UnpAckinG

Check to see that all the components are

received with no concealed damage:

1 VS-1 Base with three leveling screws

1 VS-CRA-14S (Model A) or

VS-CRA-18S (Model A 18) Rod and

clamp assembly with one mounting

screw and washer.

AsseMBly

1. Remove the mounting screw and

washer from the upright rod. Place

the rod and clamp assembly into the

hole in the top of the base.

2. Position the rod and clamp assembly

so that the clamp assembly has the

“FRONT” marking facing forward.

3. While holding the rod and base

together, insert the screw and washer

as shown and tighten securely.

4. Adjust the tension screw so that the

clamp assembly is not loose on the

upright rod.

ViscoMeter MoUntinG And Use

Insert the Viscometer mounting rod into

the hole (with the cut-away slot) in the

clamp assembly. Adjust the viscometer

level until the bubble level is centered and

tighten the clamp knob (clockwise). Use

the base leveling screws to “fine” adjust the

viscometer level.

cAUtion: Do not tighten the clamp

knob unless the viscometer mounting rod

is inserted in the clamp assembly.

Model QB Lab stand - Comes with 14”

rod (VSQA-100Y). Used with DV2T

Extra Viscometers and DV3T Extra

Rheometers. Also available as optional

choice for other viscometers when easier

up/down movement of viscometer head

is desired.

cAUtion: The Model QB upright rod

is a spring-loaded, non-serviceable device.

Do not disassemble the clamp and upright

rod assembly.

UnpAckinG

Check to see that all the components are

received with no concealed damage:

1 GV-1201 Base with two leveling screws

1 VSQA-100Y Clamp and upright rod

assembly with one mounting screw

and washer

AsseMBly

1. Remove the mounting screw and

washer from the upright rod. Place the

rod and clamp assembly into the hole

in the top of the base with the release

lever facing forward.

2. Position the rod and clamp assembly

until the slot on the bottom of the rod

intersects the pin located in the base.

3. While holding the rod and base

together, insert the screw and washer

as shown and tighten securely.

ViscoMeter MoUntinG And Use

Insert the viscometer mounting rod into

the cutaway slot of the clamp assembly.

Adjust the instrument until the viscometer/

rheometer bubble level is centered

and tighten the clamp knob. Use the

base leveling screws to "fine" adjust the

instrument level.

cAUtion: Do not tighten the clamp

knob unless the viscometer mounting rod

is inserted in the clamp assembly.
Push the release lever on the clamp

assembly. Move viscometer/rheometer

head to desired height and release lever.
Elevate your sample container, if necessary,

to ensure that the proper spindle

immersion is achieved.

cAUtion: Do not use the DV2T or

DV3T with any other laboratory stand that

does not utilize the GV-1201 base. This large

base is necessary for stability of the DV2T

Viscometer and DV3T Rheometer during

use. Earlier versions of the Brookfield

Laboratory Stand including Model A and

Model S should not be used with the DV2T

or DV3T.

Model G Lab Stand - Comes with 14” rod

(VS-CRA-14S). Used with DV1, DV2T

Viscometers and DV3T Rheometers.

Model G 18 Lab Stand - Comes with 18”

rod (VS-CRA-18S). Optional choice when

additional height is required.

UnpAckinG

Check to see that all the components are

received with no concealed damage:

1 GV-1201 Base with two leveling screws

1 VS-CRA-14S (Model G) or

VS-CRA-18S (Model G 18) Rod and

clamp assembly with one mounting

screw and washer.

AsseMBly

1. Remove the mounting screw and

washer from the upright rod. Place

the rod and clamp assembly into the

hole in the top of the base.

note: Be sure the clamp assembly has

the “FRONT” marking facing forward.

2. Position the rod and clamp assembly

until the slot on the bottom of the rod

intersects the pin located in the base.

3. While holding the rod and base

together, insert the screw and washer

as shown and tighten securely.

4. Adjust the tension screw so that the

clamp assembly is not loose on the

upright rod.

ViscoMeter MoUntinG And Use

Insert the Viscometer mounting rod into

the hole (with the cut-away slot) in the

clamp assembly. Adjust the viscometer

level until the bubble level is centered and

tighten the clamp knob (clockwise). Use

the base leveling screws to “fine” adjust the

viscometer level.

cAUtion: Do not tighten the clamp

knob unless the viscometer mounting rod

is inserted in the clamp assembly.

cAUtion: Do not use the DV2T or

DV3T with any other laboratory stand that

does not utilize the GV-1201 base. This

large base is necessary for stability of the

DV2T Viscometer and DV3T Rheometer

during use. Earlier versions of the

Brookfield Laboratory Stand including

Model A and Model S should not be used

with the DV2T or DV3T.

M13-125-B1014

Advertising