BUCHI Syncor Polyvap User Manual

Page 16

Advertising
background image

Syncore

Platform

16

4 Putting into Operation

Figure 10: Attachment of the condenser unit

4.6 Attachment of the condenser unit S and C

• Screw the right- or left-hand support rod  (depen ding

on the work-place or the working procedure) into the hole
provided in the rear feet.

• Secure the cooler bracket (shackle)  to the support rod

using the cross sleeve .

• Secure the cooler to the shackle.
• Attach the transition piece  to the cooler with the clamp

.

• Also secure the receiving vessel  to the transition piece

with the clamp .

• Fasten the cold water supply to the connection units 

and  using GL14 screwed fittings.

• Join the connection element  to the valve unit with a

GL 14 sealing cap .

It is strongly recommend to secure all hose connections by
hose clips.

Figure 11: Cooler connections

Advertising
This manual is related to the following products: