Control panel operating procedures – AERCO BMK 2.0 LN Nat. Gas for Mass. only User Manual

Page 32

Advertising
background image

CONTROL PANEL OPERATING PROCEDURES

Table 3-6.

Relationship Between Air/Fuel Valve Position and Energy Input For Unit Running On Natural Gas

Fire Rate,

Air/Fuel Valve

Position

(% Open)

Energy Input

(BTU/Hr)

Boiler Energy Input
(% of Full Capacity)

0 0 0

10% 0

0

18%

(Stop Level)

100,000

5.0%

20%

134,000 7%

30%

349,000 17%

40%

631,000 32%

50%

893,000 45%

60%

1,150,000 58%

70%

1,410,000 71%

80%

1,610,000 81%

90%

1,830,000 92%

100%

2,000,000 100%

3-10

Advertising