MAINTENANCE

7-3

7.5 SAFETY DEVICE TESTING

Systematic and thorough tests of the operating
and safety devices should be performed to
ensure that they are operating as designed.
Certain code requirements, such as ASME
CSD-1, require that these tests be performed on
a scheduled basis. Test schedules must
conform to local jurisdictions. The results of the
tests should be recorded in a log book. See
Chapter 6-Safety Device Testing Procedures.

7.6 BURNER

The burner assembly is located at the top front
of the unit. The burner assembly may be HOT.
Allow the unit to cool sufficiently before
removing the burner assembly.

The following parts will be necessary for
reassembly after inspection:

Part No.

Description

81030 Burner

Gaskets

(Qty=2)

81047

Gas Injector Gasket (Qty=1)


To inspect or replace the burner assembly:

8. Set

the

ON/OFF switch on the control panel,

to the OFF position. Disconnect AC power
from the unit and turn off the gas supply.

9. Remove the side and top panels from the

unit.

10. Disconnect the lead wire from the flame

detector. Unscrew the flame detector.

11. Disconnect the igniter cable from the igniter

contactor. Unscrew the igniter.

12. Remove the two (2) 10-32 screws securing

the gas injector to the burner. Separate the
gas injector and gasket from the burner.

13. Disconnect the burner housing from the

blower by removing the six (6) 1/4-20
screws using a 3/8” wrench.

14. Remove the eight (8) 3/8-16 nuts from the

burner flange (Figure 7-3) using a 9/16”
wrench.

NOTE

The burner housing is heavy, weighing
approximately 20 pounds.

15. Remove the burner housing from burner

flange by pulling straight up.

16. Remove the grounding screw.

If there is an extension ring around the
burner, remove it.

17. Remove the burner by pulling straight up.

18. Remove and replace the burner gaskets.

19. Beginning with the burner removed in step

11, reinstall all the components in the
reverse order that they were removed.
However, if the burner was replaced, follow
the instructions in step 14.

20. If the burner is being replaced, measure the

outside diameter (O.D.) of the new burner
flange. If the O.D. is approximately 13”, do
not reinstall the extension ring. However, if
the O.D. of the new burner flange is
approximately 12.4”, the extension ring must
be reinstalled.

21. Make sure to align the Spark Igniter (S/I)

and Flame Rod (F/R) slots in the burner with
the heat exchanger top head.

22. Check to ensure that the grounding screw is

reinstalled.

3/8-16 NUTS (8)

BURNER

HOUSING

BURNER

STAGED IGNITION

ASSEMBLY

GROUNDING

SCREW

1/4-20

SCREWS

(6)

10-32 SCREWS (2)

Figure 7-3