AERCO KC1000 Boiler equipped with C-More version 3.04 User Manual

Page 3

Advertising
background image

CONTENTS

GF-109 - THE AERCO KC1000 GAS FIRED BOILER

Operating & Maintenance Instructions

FOREWARD A

SECTION 1 – SAFETY PRECAUTIONS

1-1

Para. Subject Page
1.1

Warnings & Cautions

1-1

1.2 Emergency

Shutdown

1-2

Para.

Subject Page

1.3 Prolonged

Shutdown

1-2

SECTION 2 – INSTALLATION PROCEDURES

2-1

Para. Subject Page
2.1

Receiving the Unit

2-1

2.2 Unpacking

2-1

2.3 Installation

2-2

2.4 Gas

Supply

Piping

2-4

2.5 Electrical

Supply

2-5

2.6

Mode of Operation and Field
Control Wiring

2-6

Para.

Subject Page

2.7

I/O Box Connections

2-8

2.8

Auxiliary Relay Contacts

2-10

2.9

Flue Gas Vent Installation

2-10

2.10 Combustion

Air

2-10

SECTION 3 – CONTROL PANEL OPERATING PROCEDURES

3-1

Para. Subject Page
3.1 Introduction

3-1

3.2

Control Panel Description

3-1

3.3 Control

Panel

Menus

3-3

3.4 Operating

Menu

3-4

3.5 Setup

Menu

3-4

Para.

Subject Page

3.6 Configuration

Menu

3-5

3.7 Tuning

Menu

3-6

3.8 Start

Sequence

3-7

3.9 Start/Stop

Levels

3-9

SECTION 4 – INITIAL START-UP

4-1

Para. Subject Page
4.1

Initial Startup Requirements

4-1

4.2

Tools and Instrumentation for
Combustion Calibration

4-1

4.3

Combustion Calibration

4-2

Para.

Subject Page

4.4

Propane Combustion Calibration

4-5

4.5 Unit

Reassembly

4-6

4.6

Over-Temperature Limit Switch
Adjustments

4-6

Section 5 – MODE OF OPERATION

5-1

Para. Subject Page
5.1 Introduction

5-1

5.2

Indoor/Outdoor Reset Mode

5-1

5.3

Constant Setpoint Mode

5-2

5.4

Remote Setpoint Modes

5-2

5.5 Direct

Drive

Modes

5-3

Para.

Subject Page

5.6 Boiler

Management

System

(BMS)

5-4

5.7

Combination Control System
(CCS)

5-5

i

Advertising