Carrier 120-60-1 User Manual

Page 2

Advertising
background image

2. Remove wires from power supply and discard.

3. Connect existing wires and busbar for models 31SX and 901E

also G. (See Fig. 1.) Do the same for models 31KAX and
901KAX. (See Fig. 3.)

4. Reinstall power door in air cleaner.

5. Turn on main electrical supply to air cleaner and air handler.

6. Check air cleaner for proper operation before leaving job.

Step 5—Install New Power Supply in 240v Models
31KAX, 31SX, 901E also G, and 901KAX

1. Using 4 sheet-metal screws provided in kit, install new power

supply.

2. Remove and discard wires from power supply.

3. Connect existing wires and bus bar for models 31SX and 901E

also G. (See Fig. 2.) Do the same for models 31KAX and
901KAX. (See Fig. 4.)

4. Reinstall power door in air cleaner.

5. Turn on main electrical supply to air cleaner and air handler.

6. Check air cleaner for proper operation before leaving job. If

the unit fails to operate, check for faulty transformer.

Fig. 1—Models 31MB, 31MM, 31MP, 31SX, 907A, 901A/B, 901E/G, 907B/C with 120-60-1 Electrical Supply

A95271

EXISTING SURGE
RESISTOR

BUSBAR

EXISTING

WIRES

GND

TYPICAL WIRENUT

(WHEN REQUIRED)

WIRE CLIP

BLK

RED OR

VIO

WHT

RED

RED

WHT

BLK

VIO

2

Advertising