Q90 Series Pilot Burner Assembly Kit Installation Instructions 3

9.

Connect the sensor cable to the male spade
connector on the pilot burner sensing probe and
Terminal 4 on the ignition control.

10. Connect the high voltage on the pilot burner

assembly to the spark transformer on the ignition
control.

!

WARNING: Risk of Explosion or Fire.

Verify that there are no gas leaks by testing with
appropriate equipment. Never use a match or lighter
to test for the presence of gas. Failure to test
properly can lead to an explosion or fire and may
result in severe personal injury or death.

11. Check for leakage.

a. Shut off the gas at the main manual shutoff

valve and open the pressure connection
between the manual shutoff valve and the gas
valve.

b. Connect air tubing with a maximum pressure

of 1 1/2 times the valve’s maximum operating
pressure (as indicated on the valve) to the
opened pressure connection.

c. Paint all valve body and pilot tubing

connections with a rich soap and water
solution.

If bubbles occur, this indicates a leak. To stop
a leak, tighten joints and connections. Replace
the part if the leak cannot be stopped.

If bubbles do not occur, remove the air tubing
and close the pressure connection.

12. Perform

the

Checkout section before leaving the

installation.

Setup and Adjustments

Checkout

!

WARNING: Risk of Explosion or Fire.

Follow this or an equivalent checkout procedure
after installation. Before leaving the installation,
verify that the gas valve functions properly and that
the system has no gas leaks. Gas leaks can lead to
an explosion or fire, and may result in severe
personal injury or death.

Make sure all components are functioning properly by
performing the following test.

1.

Test all joints and connections for leaks with a
soap solution.

2.

Close the main upstream shutoff valve and wait
at least 5 minutes for unburned gas to escape
from the appliance, and then reopen the shutoff
valve.

3.

Turn on the main electrical power switch and
close the thermostat contacts. The appliance
should operate in accordance with the
manufacturer’s specified sequence of operation.

4.

Turn the thermostat to a low setting to open the
contacts. All burner flames should extinguish.

5.

Observe at least three complete operating cycles
to make sure that all components are functioning
properly.

6.

Return the thermostat to a normal temperature
setting before leaving the installation.

Repairs and Replacement

Field repairs must not be made to the Q90 pilot
assembly kit. Any attempt to repair this assembly voids
the manufacturer’s warranty. For a replacement pilot
assembly kit or accessories, contact the original
equipment manufacturer or the nearest Johnson
Controls distributor.