2206 p3.pdf, Parts list for humidifier – Braeburn 220650 User Manual

Page 3

Advertising
background image

DRAIN PAN

8

PARTS LIST FOR HUMIDIFIER

DAMPER KNOB

DAMPER DISK

SIDE PANEL DISCHARGE

PAD RAIL

229019 EVAPORATOR PAD

DISTRIBUTOR TROUGH

COVER

YELLOW ORIFICE

COMPRESSION SLEEVE

COMPRESSION NUT

CHASSIS

NOZZLE

SPOUT

229040 SOLENOID VALVE ASM

229004 STRAINER SCREEN

COMPRESSION SLEEVE

COMPRESSION NUT

DISTRIBUTOR TUBE

INSERT FOR PLASTIC TUBING

7

Turn damper knob to winter (open) position. Turn on water

supply and check operation of humidifier. Set humidistat to a

demand setting. With the furnace off, the solenoid valve should be

closed. Start the furnace. The solenoid valve should open when

the blower or burner circuit is energized. Check flow of water

through distributor trough and evaporator pad. The standard

(yellow) orifice will supply approximately 3.5 GPH of water at a

line water pressure of 60 psi. Leave humidistat set at the

recommended setting.

Connect drain hose to 1/2" spout on humidifier cabinet using

hose clamp. Run 1/2" hose to suitable drain such as floor

drain, sewer or laundry sink. Be sure hose has continuous

slope and is not kinked at any point.

Advertising
This manual is related to the following products: