22905 side 2.pdf, Checkout procedures, Technical specifications – Braeburn 229051 User Manual

Page 2: Volt and 120-volt current sensing relay

Advertising
background image

Fan Powered Humidifiers and Electronic Air Cleaners

Checkout Procedures

229050

24-volt Model

229051

120-volt Model

Voltage Range

21-24 VAC

, 50-60 Hz

100-125 VAC, 50-60 Hz

Sensing Current

Minimum 5 amps

Minimum 5 amps

Operating Ambient Temperature Range

40˚F - 104˚F

40˚F - 104˚F

Load Ratings

Maximum (12 watts) 0.50 amps

Minimum (3 watts) 0.12 amps

Maximum (130 watts) 1.5 amps

Minimum (3 watts) 0.03 amps

Technical Specifications

24-volt and 120-volt Current Sensing Relay

EAC

2 x 4

Electrical

Box

120 VAC

1. Install the Indoor Air Quality Accessory according
to the manufacturer’s instructions.

2. Install the 229051 on the common wire of the blower

motor as shown in the diagram .

3. Open the main power junction box on the side of

the furnace and run the leads of the 229051
into the junction box.

4. Connect the leads of the

229051 in series with one
of the Indoor Air Quality
device leads. Connect the
remaining lead and ground
wire. The 120 VAC source
must be independent of the
furnace blower motor.

5. Check all wire connections, close junction box

and restore furnace to working order. Test proper
functioning by observing that the air cleaner’s
indicator lamp turns on when the blower runs and
turns off when the blower stops.

229051

IAQ

DEVICE

1. Replace all safety devices.

2. Reconnect power to furnace.

3. Activate furnace blower motor.

4. Check load for operation. It should now be working properly. Check

indicating lamp or other conditions showing that the load is receiving
power.

5. Switch off the blower unit. The power to the device should shut off.

6. If the device is activated properly and turns off when the power

through the common wire is removed, installation is complete.

7. If the device is not powered when the blower is turned on:

• Ensure the device’s power switch is in the “ON” position.

• Recheck all wiring.

• Check line fuses.

• Confirm that five or more amps is flowing through the control wire.

Wrap additional turns around the bracket if necessary.

FURNACE
BLOWER
MOTOR

COMMON

LEAD

120 VAC

Model 229051 120 Volt Installation Instructions

©2009 Braeburn Systems LLC • All Rights Reserved • 22905-100-001

Braeburn Systems LLC
2215 Cornell Avenue • Montgomery, IL 60538
Technical Assistance: www.braeburnonline.com
Call us toll-free: 866-268-5599 (U.S.)
630-844-1968 (Outside the U.S.)

CURRENT
SENSING
RELAY

229050 (24-volt) and 229051 (120-volt) Current Sensing Relays

Advertising
This manual is related to the following products: