Figure A6

Floor Anchoring

Floor loading and anchoring requirements
are the responsibility of the user/installer
and all applicable building codes and
regulations must be followed. C&D
provides connection drawings, weights,
dimensions, and floor loading information
on our system drawings for reference
which is supplied with every shipment.
Anchor bolts are the responsibility of the
user/installer and are not supplied with the
order.
1. Where floor anchoring is required, place

base assembly into position and mark
the anchor locations using the base as
a template (See Figure A6 & A7).

2. Six 13/16” [20.6mm] holes are

provided in the system base for floor
anchoring.

3. Install floor anchors and reposition

base onto anchors (See Figure A8).

4. Install anchor hardware and verify top

surface of base assembly is level in
both axes, if necessary install shims to
level base.

5. Once base assembly is level, torque

anchors to proper rating based on
manufactures specification. (See Figure
A8).

6. A level base is particularly important

for the stability and safety of high,
narrow stacks.

If tool clearance is an issue rear anchors can be accessed

using a standard 3/8” extension as shown.

Figure A7

Figure A8