Assembly, Caution, 5) install the cylinder and wedge – Champion Power Equipment 92050 User Manual

Page 12

Advertising
background image

9

REV 92050-20131216

ENGLISH

92050

ASSEMBLy

C

D

A

3) Install the Beam Cont’d.

5) Install the Cylinder and Wedge

1 . Place the wedge on the beam between the cylinder

mounts and slide it forward into the rails . (A)

2 . Remove the cylinder mounting plates . (A)

3 . Install the cylinder by sliding the pegs at the end

of the cylinder into the mounting slots on top of the
beam . Be sure to slide the cylinder all the way back
into the mounting slots . (B)

5 . Hold the top of the beam by the cylinder mount and

carefully rotate the beam toward the tow bar .

6 . Once the bracket on the bottom of the beam is aligned

with the tow bar, secure with pin and R-pin . (D)

The cylinder will support itself when slid all the way
back into the mounting slots .

NOTE

4 . Secure the cylinder mounting plates with hardware

removed in step 2 . (B)

5 . Slide the wedge back toward the cylinder and align

the bolt hole in the wedge with the bolt hole in the
cylinder rod . (B)

6 . Secure the wedge to the cylinder rod with an

M12x75 bolt and M12 nut . Lightly tighten the nut to
approximately 5 ft-lb . (B)

B

The cylinder rod may need to be rotated slightly
in order to properly align the the wedge . Insert a
screwdriver into the bolt hole in the cylinder rod
and slowly rotate as needed .

NOTE

3 . Slowly lift the front of the tow bar to roll the frame

toward the beam and carefully align the pivot holes
on the bottom of the beam and the top of the
hydraulic oil tank .

4 . Once aligned, secure the beam to the tank with hitch

pin and R-pin . (C)

B

Beam is heavy . Use at least 2 people when lifting or
moving the beam .

CAUTION

Advertising