Ec c p, 2 - d, 3 - d – Child Craft CCH00701:09/00 User Manual

Page 2: 4 - d

Advertising
background image

2

CCH00701:09/00

S

TEP

2 - D

IAGRAM

2: I

NSTALL

S

TABILIZER

B

ARS

.

Attach each Stabilizer Bar

J

J

J

J

J

to crib ends

N

N

N

N

N

and

O

O

O

O

O

. Refer to Diagram 2 and MAIN

DIAGRAM 6. You will use a total of (8) Slotted/Phillips Machine Screws

A

A

A

A

A

. Place a

Slotted/Phillips Machine Screw

A

A

A

A

A

into top receiving bushing, designated for Stabilizer

Bar

J

J

J

J

J

placement, located in ends

O

O

O

O

O

&

N

N

N

N

N

as shown, leave each top screw extended

- do not tighten at this time. Place the keyhole

(top hole in each end of Stabilizer Bar

J

J

J

J

J

, over top extended Screws

A

A

A

A

A

(which you have just installed and left extended), refer

to Diagram.

Ends

N

N

N

N

N

and

O

O

O

O

O

will now be mounted together on one side of crib, repeat

this procedure for mounting the remaining Stabilizer Bar

J

J

J

J

J

to the other side of the crib

in the exact same manner. Place four Slotted/Phillips Machine Screws

A

A

A

A

A

into the lower

receiving holes in each end of both Stabilizer Bars

J

J

J

J

J

, into receiving bushings located in

ends

N

N

N

N

N

&

O

O

O

O

O

, tighten all eight Slotted/Phillips Machine Screws

A

A

A

A

A

securely at this time.

A

A

Extended

J

I

Factory
installed

Keyhole

O

S

TEP

3 - D

IAGRAM

3: A

TTACH

G

ATE

S

HOES

TO

D

ROPSIDES

.

Position two Gate Shoes

C

C

C

C

C

to lower rail

(inside) of each Crib Side

P/Q

P/Q

P/Q

P/Q

P/Q

as

shown. Note: Gate Shoe Patent No. will be visible when Gate Shoes

C

C

C

C

C

are

mounted. Align Gate Shoes

C

C

C

C

C

over predrilled lead holes on lower rail

(inside)

of Crib Side

P/Q

P/Q

P/Q

P/Q

P/Q

(dropsides) and affix with (8) Slotted/Phillips Wood Screws

E

E

E

E

E

, two in each Gate Shoe

C

C

C

C

C

. Tighten Screws

E

E

E

E

E

securely. Note: When

disassembling crib in the future, DO NOT REMOVE THE GATE SHOES

C

C

C

C

C

OR

ANY OTHER HARDWARE ITEM ATTACHED WITH SLOTTED/PHILLIPS
WOOD SCREWS

E

E

E

E

E

.

E

C

C

P

o r

Q

Locate Crib Spring

R

R

R

R

R

,

(with plastic pouch factory attached), and the four

Spring Hangers

B

B

B

B

B

, refer to Main Diagram 6, and 4. Note: Be sure smooth

side of Crib Spring

R

R

R

R

R

wire is placed upward as illustrated in Main Diagram

6. Also the printing on the plastic pouch

(attached to crib spring) will be

placed upward. Insert Spring Hangers

B

B

B

B

B

into each bracket attached to

frame of Crib Spring

R

R

R

R

R

as shown, (a light blow with a hammer may be

required to fully engage Spring Hangers

B

B

B

B

B

)

. Carefully install Crib Spring

R

R

R

R

R

by placing each of the 4 Spring Hanger

B

B

B

B

B

into a selected position in each

of the four 4-Position Spring Hanger Brackets

D

D

D

D

D

, (with moulded plastic

backers), mounted on ends

O

O

O

O

O

and

N

N

N

N

N

. See Main Diagram 6, and 4. Note:

The lip of the moulded plastic backer will allow the Spring Hanger to be
placed with no difficulty. However, when you decide on another placement
of Crib Spring

R

R

R

R

R

you will need to place your thumbnail, or a small

screwdriver, on the lip of the moulded plastic backer and hold down in order
to raise Spring Hanger

B

B

B

B

B

from its present position. Follow this same

procedure whenever you opt to change Crib Spring

R

R

R

R

R

to another of the

four positions.

B

B

B

B

B

S

TEP

4 - D

IAGRAM

4: I

NSTALL

S

PRING

H

ANGERS

& C

RIB

S

PRING

CLOSE UP

CLOSE UP

CLOSE UP

CLOSE UP

CLOSE UP
VIEW

VIEW

VIEW

VIEW

VIEW

To remove Spring
Hanger

B

B

B

B

B

press

down on lip with
thumbnail or screw-
driver and pull Spring
Hanger

B

B

B

B

B

upward.

D

D

D

D

D

E

E

E

E

E

B

B

B

B

B

R

R

R

R

R

Top surface

S

TEP

5: I

NSTALL

C

RIB

D

ROPSIDES

Locate Crib Rods

K

K

K

K

K

, Crib Sides

P/Q

P/Q

P/Q

P/Q

P/Q

, Compression Springs

F

F

F

F

F

, Bumper

Springs

G

G

G

G

G

and the four remaining Slotted/Phillips Machine Screws

A

A

A

A

A

. Insert

a Crib Rod

K

K

K

K

K

downward through the holes in the following sequence:

(Refer

to Main Diagram 6 for proper placement.)

Place a Slotted/Phillips Machine Screw

A

A

A

A

A

into hole in top of Crib Rod

K

K

K

K

K

and into receiving bushing located in top corner post of Footboard

O

O

O

O

O

/

Headboard

N

N

N

N

N

. Refer to Main Diagram 6 for proper placement. DO NOT

USE A POWER SCREWDRIVER OF ANY TYPE TO TIGHTEN SCREW

A

A

A

A

A

.

Start Screw

A

(two or three turns) with your fingers into its threaded

bushing to insure Screw

A

has a square fit. Once you are sure Screw

A

fits squarely into its threaded bushing, tighten securely with a hand

held screwdriver. Attach the other Crib Rod

K

K

K

K

K

to the other end of Crib

Side

P

P

P

P

P

or

Q

Q

Q

Q

Q

,

, using the same procedure. Be sure Slotted/Phillips

Machine Screws

A

A

A

A

A

are tightened securely, check periodically and

tighten if needed.

Tip:

Tip:

Tip:

Tip:

Tip:

To help Crib Rods

K

K

K

K

K

function more quietly we

suggest you rub the crib rod with waxed paper or paraffin. You may want
to repeat this procedure periodically.

Attach the remaining Crib Side

P

P

P

P

P

or

Q

Q

Q

Q

Q

, by repeating Step 5.

1.

1.

1.

1.

1.

The top rail of Crib Side

P

P

P

P

P

or

Q

Q

Q

Q

Q

,

(with plastic teething rail),

(Note: gate shoes will be placed to inside),

2.

2.

2.

2.

2.

The L- bracket on 4-Position Spring Hanger Bracket

D

D

D

D

D

,

3.

3.

3.

3.

3.

Compression Spring

F

F

F

F

F

,

4.

4.

4.

4.

4.

Bottom Rail of Crib Side

P

P

P

P

P

or

Q

Q

Q

Q

Q

,

5.

5.

5.

5.

5.

A Bumper Spring

G

G

G

G

G

,

6.

6.

6.

6.

6.

Hole in Angle Bracket

I

I

I

I

I

.

Advertising