Receiving and Installation

Before you sign the Bill of Lading

:

1. Receiving- Inspect units inside and out for signs of damage

Verify all components are delivered per the Bill of Materials.

Report damage to the carrier IMMEDIATELY.
Note ALL damage on the Bill of Lading.
This is your responsibility and you must file all claims

.

The filter is fully assembled and ready for installation. The
control, valves, lint bag is in a cardboard box. Make sure both
are complete. Per Exhibit A.


2. Installation- Follow instructions attached:

Determine the location with reference to minimum duct work from the tumbler
and ease of access for inspection.

If using a lint drop pipe allow enough room for lint to travel down 4’ before the
first bend. Max bend angle is 30 degrees.

If using lint bag or container make sure adequate clearance is allowed.

Conduit or Sealtight between filter junction boxes should be ¾ inch.

Not all connection positions 1-16 on the three Control Box terminals, J1, J2
and J3 will not necessarily have wires connected to them, it depends on the
options ordered.

If the Fire Contro Option is NOT ordered the installer must supply a junction
box to connect the wires from the Pressure Input Box and valves to the wires
running to the Control Box.

When mounting the filter overhead, mount the control below the filter where it
can be easily accessed.