Receiving and installation, Before you sign the bill of lading – Energenics Super Series Lint Filter (Old) User Manual

Page 3

Advertising
background image



Receiving and Installation

Before you sign the Bill of Lading

:

1. Receiving- Inspect units inside and out for signs of damage

Verify all components are delivered per the Bill Of Materials.

Report damage to the carrier IMMEDIATELY.
Note ALL damage on the Bill of Lading.
This is your responsibility and you must file all claims

.

The filter is fully assembled and ready for installation. The
control, valves, lint bag is in a cardboard box. Make sure both
are complete. Per Exhibit A.


2. Installation- Follow instructions attached:

Determine the location with reference to minimum duct work from the tumbler
and ease of access for inspection.

If using a lint drop pipe allow enough room for lint to travel down 4’ before the
first bend. Max bend angle is 30 degrees.

If using lint bag or container make sure adequate clearance is allowed.

















Advertising