Receiving and installation, Before you sign the bill of lading – Energenics Wallhugger Series Lint Filter (Old) User Manual

Page 3

Advertising
background image










Receiving and Installation

Before you sign the Bill of Lading

:

1. Receiving- Inspect units inside and out for signs of damage

Verify all components are delivered per the Bill of Materials.

Report damage to the carrier IMMEDIATELY.
Note ALL damage on the Bill of Lading.
This is your responsibility and you must file all claims

.

The filter is fully assembled and ready for installation. The control, valves,
lint bag is in a cardboard box. Make sure both are complete. Per Exhibit A.


2. Installation- Follow instructions attached:

Determine the location with reference to minimum duct work from the tumbler and ease of
access for inspection.

If using a lint drop pipe allow enough room for lint to travel down 4’ before the first bend. Max
bend angle is 30 degrees.

If using lint bag or container make sure adequate clearance is allowed.























Advertising