EVCO PR100AX9S001 User Manual

Pr 100a, Smart guide

Advertising
background image

Every Contr

ol S.r

.l. • PR 100A • Sheet 1/3

1

PREPARATIONS

1.1 How to install the instrument

Panel mounting, panel cut out 92 x 92 mm (3.62 x 3.62 in), with

screw brackets (they are supplied by the builder).

smart guide

PR

100A

Two channels data recorder (one can ex-

pand them up to six)

Version 2.10 of 21

st

April 2004

File pr100a_eng_v2.10.pdf

PT

EVERY CONTROL S.r.l.

Via Mezzaterra 6, 32036 Sedico Belluno ITALY

Phone 0039-0437-852468 • Fax 0039-0437-83648

[email protected] • www.evco.it

installation with screw brackets (position the brackets as indicated); you have to moder-

ate the clamping torque, in order not to damage the box and screw brackets.

2

OPERATION

2.1 How to turn the instrument ON/OFF

If you have to turn the instrument ON/OFF:

• press

During the normal operation the instrument prints and/or stores

the values the probes are reading and the events.

During the OFF mode the instrument stores the values the probes

are reading and the events.

2.2 How to feed the paper by hand

If you have to feed the paper by hand:

• press

2.3 How to change the roll of paper

If you have to change the roll of paper:

• turn the instrument OFF

• press

for opening the panel at

the front of the instrument

• slip the roll of paper into the lower side of the roller

• press

as long as the roller drags

the roll of paper

• put the roll of paper into its box

• close the panel at the front of the instrument.

ENGLISH

Advertising