Carrier 50SX024-060 User Manual

Installation, start-up and service instructions

Advertising
background image

Installation, Start-Up and

Service Instructions

CONTENTS

Page

SAFETY CONSIDERATIONS

. . . . . . . . . . . . . . . . . 1-12

General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

RECEIVING AND INSTALLATION

. . . . . . . . . . . 13-26

Step 1 — Check Equipment

. . . . . . . . . . . . . . . . . . 13

• IDENTIFY UNIT
• INSPECT SHIPMENT

Step 2 — Provide Unit Support

. . . . . . . . . . . . . . 13

• ROOF CURB
• SLAB MOUNT

Step 3 — Provide Clearances

. . . . . . . . . . . . . . . . 13

Step 4 — Rig and Place Unit

. . . . . . . . . . . . . . . . . 13

• UNITS WITHOUT BASE RAILS
• UNITS WITH OPTIONAL BASE RAILS

Step 5 — Select and Install Ductwork

. . . . . . . . 16

• CONVERTING HORIZONTAL DISCHARGE

UNITS TO DOWNFLOW (VERTICAL) DISCHARGE
— STD (NON-ICM) UNITS

• CONVERTING HORIZONTAL DISCHARGE UNITS

TO DOWNFLOW (VERTICAL) DISCHARGE
— ICM UNITS

• ACCESSORY DUCT FLANGE KIT INSTALLATION

Step 6 — Provide for Condensate Disposal

. . . 20

Step 7 — Install Electrical Connections

. . . . . . 21

• HIGH-VOLTAGE CONNECTIONS
• ROUTING POWER LEADS INTO UNIT
• CONNECTING GROUND LEAD TO

WIRE-BINDING SCREW

• ROUTING CONTROL POWER WIRES — STD

NON-ICM UNITS (24 V)

• ROUTING CONTROL POWER WIRES — ICM

UNITS (24 V)

• SPECIAL PROCEDURES FOR 208-V

OPERATION

PRE-START-UP

. . . . . . . . . . . . . . . . . . . . . . . . . . . . 26,27

START-UP

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27-39

Check for Refrigerant Leaks

. . . . . . . . . . . . . . . . . 27

Start-Up Cooling Section and

Make Adjustments

. . . . . . . . . . . . . . . . . . . . . . . . 27

MAINTENANCE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . 40,41

Air Filter

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

Unit Top Removal

. . . . . . . . . . . . . . . . . . . . . . . . . . . 40

Evaporator Blower and Motor

. . . . . . . . . . . . . . . . 40

Condenser Coil, Evaporator Coil,

and Condensate Drain Pan

. . . . . . . . . . . . . . . . 41

Condenser Fan

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

Electrical Controls and Wiring

. . . . . . . . . . . . . . . 41

Refrigerant Circuit

. . . . . . . . . . . . . . . . . . . . . . . . . . 41

Evaporator Airflow

. . . . . . . . . . . . . . . . . . . . . . . . . . 41

Metering Devices

. . . . . . . . . . . . . . . . . . . . . . . . . . . 41

Liquid Line Strainer

. . . . . . . . . . . . . . . . . . . . . . . . . 41

TROUBLESHOOTING COOLING CHART

. . . . . 42,43

START-UP CHECKLIST

. . . . . . . . . . . . . . . . . . . . . CL-1

NOTE TO INSTALLER — Before the installation, READ
THESE INSTRUCTIONS CAREFULLY AND COM-
PLETELY. Also, make sure the Owner’s Manual and Serv-
ice Instructions are left with the unit after installation.

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment

can be hazardous due to system pressure and electrical com-
ponents. Only trained and qualified personnel should install,
repair, or service air-conditioning equipment.

Untrained personnel can perform basic maintenance func-

tions of cleaning coils and filters. All other operations should
be performed by trained service personnel. When working
on air-conditioning equipment, observe precautions in the
literature, tags and labels attached to the unit, and other safety
precautions that may apply.

Follow all safety codes. Wear safety glasses and work gloves.

Use quenching cloth for unbrazing operations. Have fire ex-
tinguisher available for all brazing operations.

Before performing service or maintenance operations on
system, turn off main power to unit. Turn off accessory
heater power switch if applicable. Electrical shock can
cause personal injury.

General —

50SS,SX cooling units are fully self-contained

and designed for outdoor installation. See Fig. 1. As shown
in Fig. 2-9, both small- and large-cabinet units are shipped
in a horizontal-discharge configuration for installation on
a ground-level slab. All units can be converted to down-
flow discharge configurations for rooftop applications. See
Fig. 10 for roof curb dimensions.

Instructions continued on page 13.

Fig. 1 — Unit 50SX With Optional Base Rail Shown

50SS018-060
50SX024-060

Single-Package Cooling Units

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1

4

Tab

1b 6b

PC 111

Catalog No. 535-022

Printed in U.S.A.

Form 50SS,SX-4SI

Pg 1

5-95

Replaces: 50SS,SX-3SI

Advertising
This manual is related to the following products: