Installation steps, Installation steps 13 – Interlogix MC250-1T/1S User Manual

Page 17

Advertising
background image

IFS MC250-1T/1S User Manual 13

Installation Steps

Step 1: Unpack the Industrial Fast Ethernet Switch.

Step 2: Check that DIN-Rail is screwed on the Industrial Fast
Ethernet Switch. (Please refer to the DIN-Rail Mounting
section for DIN-Rail installation. If you want to wall mount the
Industrial Fast Ethernet Switch, then please refer to Wall
Mount Plate Mounting section for wall mount plate installation.

Step 3: To install the Industrial Fast Ethernet Switch on the
DIN-Rail track or wall, please refer to the Mounting Installation
section.

Step 4: Power on the Industrial Fast Ethernet Switch. (Please
refer to the Wiring the Power Inputs section for power input)
The power LED on the Industrial Fast Ethernet Switch will light
up. Please refer to the LED Indicators section for meaning of
LED lights.

Step 5: Prepare the twisted-pair, straight through Category 5
cable for Ethernet connection.

Step 6: Insert one side of Category 5 cables into the Industrial
Fast Ethernet Switch Ethernet port (RJ-45 port) and the other
side to the network device Ethernet port (RJ-45 port), ex:
Switch, PC or Server. The UTP port (RJ-45) LED on the
Industrial Fast Ethernet Switch will light up when the cable is
connected to the network device. Please refer to the LED
Indicators section for LED light meaning.

Step 7: Insert fiber cable from the MC250-1T/1S to the fiber
network. TX, RX must be paired at both ends. The optical port
LED on the MC251-1T/1S will illuminate when the connection
is established with network device. Please refer to the LED
Indicators section for LED light meaning.

Step 8: When all connections are set up and the LEDs
illuminate, the installation is completed.

Advertising