Installation – Chief Manufacturing PL-1 User Manual

Page 4

Advertising
background image

Installation Instructions

PL-1

4

INSTALLATION

This manual contains installation procedures that cover
pole-mounted applications:

NOTE: Omit Step1 thru 3 and proceed to Step 4 if the

projector is already installed on the 1-1/2” NPT pipe.

1. If projector is mounted, remove projector and SLB.

2. Loosen the thumbnuts and disconnect your projector

from the RPA.

3. Install the RPA mount on the 1-1/2” NPT pipe as

described in the instructions for your RPA mount.

4. Unlock and open the PL-1.

5. Align set screw of RPA with key lock of cage (see

Figure 1).

6. Tilt the lock side of the PL-1 down and route the RPA

thru the hole in the PL-1 (see Figure 2).

7. Set PL-1 on RPA (see Figure 3).

Figure 1. Align Set Screw & Key Lock

Figure 2. Place PL-1 on RPA

Figure 3. PL-1 on RPA


Set Screw

Key Lock

Advertising