4 powering up and stacking the seh, Powering up and stacking the seh -5, Wering up and stacking the seh (section 4.4) – Cabletron Systems SEH100TX-22 User Manual

Page 29: Figure 4-4 installing the seh in the rack, Screws (4) 19-inch rack

Advertising
background image

Powering Up and Stacking the SEH

SEH100TX User’s Guide

4-5

Figure 4-4

Installing the SEH in the Rack

Proceed to Section 4.4, Powering Up and Stacking the SEH.

4.4

POWERING UP AND STACKING THE SEH

The following section details the procedures that must be followed to
power up and interconnect stacked hubs.

If you are using an SEHI to manage the SEH stack, proceed to
Section 4.4.1. If you are not using an SEHI to manage the SEH stack,
proceed to Section 4.4.2.

!

CAUTION

Failure to follow this procedure may result in damage to the
equipment.

!

CAUTION

If you are using an intelligent hub (SEHI) to manage the stack,
you must locate the SEHI at the bottom of the stack.

The SEHI must be completely powered up and initialized
before powering up and interconnecting the rest of the stack.

Screws (4)

19-Inch Rack

1510_06

PWR
MGMT

CLN

HubSTACK

100BASE-TX HUB

WITH

LANVIEW®

SEH

100TX-

22

22X 21X 20X 19X 18X 17X

11X 10X 9X 8X 7X 6X

16X 15X 14X 13X 12X

5X 4X 3X 2X 1X

E
1

E
2

RCV
LNK

RCV
LNK

22 21 20 19 18 17 16 15 14 13 12

11 10 9 8 7 6 5 4 3 2 1

EPIM

1

EPIM

2

Advertising