Setup instructions, Save these instructions, Pool setup (continued) – Intex 18 FT X 52 IN ULTRA FRAME POOL 2013 User Manual

Page 7

Advertising
background image

(118PO) ULTRA FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 07/20/2012

118

PO

SAVE THESE INSTRUCTIONS

Page 7

English

SETUP

INSTRUCTIONS

POOL SETUP (continued)

You may have purchased this pool with the Intex Krystal Clear™ filter pump. The pump has

its own separate set of installation instructions. First assemble your pool unit and then set up

the filter pump.

Estimated assembly time 45-60 min. (Note the assembly time is only approximate and

individual assembly experience may vary.)
1. Liner preparation

• Find a flat, level location that is free and clear of stones, branches or other sharp objects

that may puncture the pool liner or cause injury.

• Open the carton containing the liner, joints, legs, etc., very carefully as this carton can be

used to store the pool during the winter

months or when not in use.

• Take out the ground cloth

(7) (optional)

and spread it over the cleared area. Then,

take out the liner

(5) and spread it out over

the ground cloth, with the drain valve directed

towards the draining area. Place the drain

valve away from the house. Allow the sun to

warm up the liner before inserting the beams

(4) into the sleeve openings.

IMPORTANT: Always set up the pool

unit with at least 2 persons. Do not drag the liner across the ground as this can

cause liner damage and pool leakage (see drawing 1).

• During the setup of this pool liner, point the hose connections or openings in the

direction of the electric power source. The outer edge of the pool should be within reach

of the pump’s electrical connection.

2. Frame assembly

• The frame pool’s legs

(2) and beams (4) fall into two

groups. The smaller diameters are the vertical legs. Both

these legs and beams fit into the T-joints

(1).

• Starting at any location, but always working in the

same direction, push the horizontal beam into the

sleeve

(see drawing 2.1). Once the beam is centered

take one of the T- joints

(1), snap the joint to one end

of the beam by aligning the hole and the spring-loaded

pin. Repeat this procedure in a circular fashion until all

the beams and joints have been connected

(see drawing 2.2).

The last joint connection may be difficult to complete,

but can be easily done by simultaneously raising this

last joint and beam more than 2 inches (5 cm), and

connect the beam to the joint while lowering these

pieces to their normal position. The joint will slide into

the beam (see drawing 2.3). Make sure the last joint is

fully assembled before proceeding to assembling the

legs.

1

5

2.1

2.3

1

2.2

Advertising
This manual is related to the following products: