Jaypro sports – Jaypro Sports BSP-30 User Manual

Page 3

Advertising
background image

Page 3 of 5

JAYPRO SPORTS

BASEBALL 3 PANEL; BSP-30

INSTALLATION INSTRUCTIONS FOR

PERMANENT BASEBALL BACKSTOPS

IMPORTANT NOTICE:
1) INSPECT FOR DAMAGE. REPORT ALL DAMAGES TO TRUCKING
COMPANY.
2) BEFORE EACH USE CHECK EQUIPMENT FOR PROPER CONNECTING
HARDWARE AND STRUCTURAL INTEGRITY. REPLACE DAMAGED OR
MISSING HARDWARE IMMEDIATELY.
3) USE OF THIS EQUIPMENT OTHER THAN INTENDED, MAY BE HAZARDOUS.
4) ALTERATION OR MODIFICATION OF THIS EQUIPMENT MAY BE
HAZARDOUS AND RESULT IN INJURY. FOR REPAIR OR REPLACEMENT,
CONTACT YOUR DEALER OR JAYPRO SPORTS.



NOTE: FOR BEST RESULTS, THIS UNIT SHOULD BE INSTALLED BY A LOCAL
CONTRACTOR WHO IS FAMILIAR WITH LOCAL CONDITIONS AND BUILDING CODES.

Footing:

1. Check local building codes before starting the footing, as building codes may vary. Local

building codes should be adhered to if requirements are greater than those outlined here.

2. Space footing 10 ft on center as shown below.

Footing Layout

3. Dig a hole 18 inches square or round to a depth of 36 inches, pour a 6 inch footing and allow

curing or placing upright on two 6 inch concrete blocks.

4. Position and square the 180” long upright onto the footing base. Pour the reminder of the footing.

Allow the concrete to fully cure, per the manufacturer’s instructions, before attaching the pipe
fittings.

Advertising