Jaypro sports – Jaypro Sports EC-500 User Manual

Page 2

Advertising
background image

Rev: A

5/23/2011

JAYPRO SPORTS

VOLLEYBALL STANDARD CARRIER, EC-500

LIST OF MATERIALS

PIECE NO.

DESCRIPTION

QTY.

1

5” STEM MOUNTED SWIVEL CASTER WHEEL 4

2

SIDE FRAME ASSEMBLY

2

3

2” x 2” END PLUG (FACTORY INSTALLED)

4

4

TUBE INSERT (FACTORY INSTALLED)

8

5

M8 x 80mm MACHINE SCREW ZP

8

6

CROSSBAR

4

7

J HOOK COVERS (FACTORY INSTALLED)

8

ASSEMBLY INSTRUCTIONS

TOOLS REQUIRED: FLAT BLADE SCREWDRIVER

RUBBER MALLET OR WOOD BLOCK


1) ASSEMBLE THE CROSSBARS (6) TO THE SIDE FRAME ASSEMBLIES AS

SHOWN IN THE ILLUSTRATION USING THE M8 x 80mm MACHINE
SCREWS (5). TIGHTEN SECURELY AFTER FRAME IS COMPLETELY
ASSEMBLED.

2) FIRMLY SLIDE EACH STEM CASTER (1) INTO THE SOCKET IN THE

BOTTOM OF EACH SIDE FRAME LEG. THE CASTER MUST BE FULLY
SEATED IN THE SOCKET FOR THE UNIT TO ROLL PROPERLY.


Advertising