Figure 4-5 installing the sehi in the rack, Screws (4) 19-inch rack – Cabletron Systems SEHI100TX-22 User Manual

Page 32

Advertising
background image

Chapter 4: Installation

4-6

SEHI100TX User’s Guide

3. Ensure that the rack used will support the unit, and that the rack will

remain stable with the unit installed in it. Support the SEHI securely
from underneath, and align the mounting brackets of the SEHI chassis
with the screw holes in the equipment rack as shown in Figure 4-5.
Fasten the SEHI to the equipment rack securely.

Figure 4-5

Installing the SEHI in the Rack

Proceed to Section 4.5, Powering Up and Stacking the SEHI.

!

CAUTION

The cooling fans at the rear panel of the SEHI must have
adequate clearance (two inches on either side and in the
rear
) for unrestricted air flow. The temperature for the selected
location must be maintained between 5

°

C and 40

°

C, and

fluctuate less than 10

°

C per hour.

PWR
CPU

CLN

HubSTACK

100BASE-TX HUB

WITH

LANVIEW®

SEHI

100TX-

22

22X 21X 20X 19X 18X 17X

11X 10X 9X 8X 7X 6X

16X 15X 14X 13X 12X

5X 4X 3X 2X 1X

E
1

A

RCV
LNK

RCV
LNK

22 21 20 19 18 17 16 15 14 13 12

11 10 9 8 7 6 5 4 3 2 1

EPIM

1

Screws (4)

19-Inch Rack

1511_06

Advertising