Attach the cable-management bracket, Four-post rack installation, Cable-management bracket – Cisco 7301 User Manual

Page 8: M4 x 20-mm screw

Advertising
background image

8

Attach the Cable-Management Bracket

Figure 6

Attaching the Cable-Management Bracket

Step 1

Align the cable-management bracket (1) to the rack-mount bracket on the left side of the Cisco 7301 router.

Step 2

Using a Phillips screwdriver and the M4 x 20-mm screw (2), thread and tighten the screw to the cable-management
bracket.

Go to the “Four-Post Rack Installation” section on page 8 or the “Two-Post Rack Installation” section on page 9.

Four-Post Rack Installation

Figure 7

Installing the Cisco 7301 Router in a Four-Post Rack

Note

Inner clearance (the width between the inner sides of the two posts or rails) must be at least 17.3 inches (43.9 cm) The
height of the chassis is 1.73 inches (4.39 cm). Airflow through the chassis is from front to back.

1

Cable-management bracket

2

M4 x 20-mm screw

1

Four-post rack

3

Four 12-24 x 0.5-inch screws

2

Screw hole for cable-management bracket

ENABLED

RX CELLSRX CARRIER

RX ALARM

80278

1

2

ALARM

RJ45 EN

LINK

TX

RX

GBIC

GIGABIT ETHERNET 0/2

RJ45 EN

LINK

TX

RX

GBIC

GIGABIT ETHERNET 0/0

RJ45 EN

LINK

TX

RX

GBIC

GIGABIT ETHERNET 0/1

CISCO 7301

SLOT 1

CONSOLE

AUX

COMPACT

FLASH

STATUS

100-240V

, 2A, 50/60 Hz

24V=9A, 48 - 60V

=5A

B

A

ENABLED

RX CELLSRX C

AR

RIER

RX ALARM

ATM

80908

1

2

3

Advertising