Assembly instructions – KERO Neris 2 User Manual

Page 8

Advertising
background image

Step 8.

Install the washboards.

Before installing the

washboards replace the wing nuts from U-bolts on
Cross ibs. Insert the round rope skin edge into the
open end of the grooved channel at the bottom of
the washboard sections.

Engage curved bow

section of the washboard from the bow and rear
section from the stern. Move both bow and stern
sections to the center of the kayak and meet the
washboard holes with the U-bolts of Cross ibs.
Secure the washboard sections by wing nuts.
Make sure the first and last washboard holes are
secured first. Then proceed with other sections.

Two people are recommended to complete this
step.

The first person pulls the washboard in

place. The other person puts the wing nut on.

r

r

When all wing nuts are in place tight them up
securely.

7

3. Assembly instructions

Advertising