Cable management, Adjustments – Chief Manufacturing KSG110 User Manual

Page 7

Advertising
background image

Installation Instructions

KSG110

7

Figure 6

Cable Management

1.

Attach all cables to display.

2.

Open the cable management bracket by sliding it towards
the edge of the arm (See Figure 7).

NOTE:

If necessary, cable management bracket attach screws

may be loosened using hex key.

Figure 7

CAUTION:

Ensure that adequate cable slack exists for

movement of display, and that cables will not be pinched
when bracket is closed.

3.

Carefully insert cables into bracket (See Figure 8).

Figure 8

4.

Close cable management bracket by sliding it back towards
the centerline of the arm (See Figure 7).

NOTE:

If necessary, cable management bracket attach screws

may be tightened using hex key.

CAUTION:

Ensure that adequate cable slack exists for

movement of display, and that cables will not be pinched by
installation of cover (E) or screws (F).

5.

Carefully insert cables in cavity located in lower portion of
mount arm (See Figure 9).

6.

Using Phillips screwdriver, install cover (E) with two
screws (F).

Figure 9

Installation is complete.

Adjustments

Centris Head Tension Adjustment

1.

If previously attached, disconnect cables from
display, remove display.

G2 or G3
(4 places)

G4 or G5
(4 places)

Centris Cup

7

5

OPEN Position

CLOSED Position

View from Bottom

Attach
Screws

Cable Path (typical)

NOTE: Display not shown for clarity.

Cable Management
Bracket (in open position)

F x 2

Cable Path
(typical)

E

Advertising