Maintenance – Leslie Controls AEROFLOW SUPPLEMENT Chesterton Live Loaded Packing User Manual

Page 3

Advertising
background image

MAINTENANCE

1.

Check the condition of the following components prior to assembly:
-

A 10 to 32 RMS (7.5 to 24 Ra) stem finish is required.

-

The stuffing box bore should be 125 RMS (94 Ra) or better finish.

-

The stem run out should not exceed +/- .010 TIR/Ft.

-

The stuffing box (packing bore) must be clean, i.e. completely free of any previous packing or
foreign material.

-

The valve stem must be clean, free of nicks, scratches and burrs.


Check gland adjustment after a few hours of service. Retighten to the values given above as necessary.

Advertising