Malone MPG113MD User Manual

Malone, Ss combo, Step 1: stinger pre-assembly

Advertising
background image

MALONE

R

SS Combo

SS Combo

TM

SEAWING KAYAK CARRIER with

STINGER LOAD ASSIST

Extension Frame

Mounting Plate

V-Block

70mm Bolts

TM

TM

Stinger Load Assist Components

TM

Installation & Loading Instructions - Please Read Before Beginning

. Insert the two 1” bolts into the two holes

located on the bottom side of the Extension

Frame. Tighten with a phillips screwdriver.

See image 2.

Step 1: Stinger Pre-Assembly

. Place the V-Block into the channel located directly

behind the Malone logo on the Extension Frame.

See image 1.

1

2

12’ Safety Lines

MD Series Only

Jawz Universal Adapters

Mounting Bolts

60mm

50mm

SeaWing Kayak Carriers

12’ Load Straps

T-Knobs

Rubber Plugs

SeaWing Kayak Carrier Components

TM

T-knobs

1” Bolts

1 3/4” Bolts

TM

Advertising