Tools required for installation, Instructions step 1 – Chief Manufacturing Single Stud Wall Arm CTA-025 User Manual

Page 5

Advertising
background image

Installation Instructions

CTA-025

5

TOOLS REQUIRED FOR
INSTALLATION

The tools required for installation are as follows:
• Electric drill and bit set
• Stud sensor (mechanical or electronic)
• ½” box-end wrench or ratchet with ½” socket
• 13mm box-end wrench or ratchet with 13mm socket
• Level

NOTE:

Other tools may be required depending on
your method of installation.

INSTRUCTIONS
Step 1

Installing Wall Arm

1. Locate the wall arm (10), two lag bolts (30) and two

flat washers (40). See Figure 2.

WARNING

It is the installer’s responsibility to verify that the
structure to which the mount is anchored will safely
support five times the combined load of all attached
components and equipment.

2. Determine a suitable mounting location. Keep in

mind that you will be mounting the wall arm (10) to
a wood stud, on center.

3. Using a stud sensor, locate the wood stud where you

will mount the wall arm (10).

4. Holding the wall arm (10) against the wall, use a

pencil, awl, or small nail to mark the mounting holes
where two pilot holes will be drilled into the center
of the wood stud. Make sure that the mounting holes
are centered.

5. Using a 15/64” drill bit, drill two pilot holes for

anchoring the wall arm (10).

6. Using two 5/16” lag bolts (30) and two 5/16” flat

washers (40), install the wall arm (10) on the wall.






Figure 2. Install Wall Arm

Wall Stud

(30)

(40)

(10)

Advertising