NORAC UC4.5-BC-NT4 User Manual

Page 23

Advertising
background image



20

Figure 23: Valve Cable Configurations Outside of Cab

5. Route connector R6B/P6 on cable C14 to the front of the sprayer just behind the sprayer

boom disconnect point.

6. Connect cable C15 and C14 together and route the ends of C15 so they are near the

sprayer boom valve block at the front of the sprayer.

7. Disconnect the four metri-pack connectors for the boom tilt cylinders from the Nitro valve

block and connect them to their respective connectors on cable C15. Use Table 1 to
match the connectors together.

Each metri-pack connector on C15 is marked with its function.

Table 1: Boom Tilt Functions

Sprayer

Connector

Function

NORAC

Connection

BM17

Left Boom UP

S2A

BM16

Left Boom DOWN

S2B

BM 15

Right Boom UP

S2C

BM14

Right Boom DOWN

S2D

8. Connect connector T6 on cable C03 to S6 on C15. Connect the 2-pin connectors on C03

to the NORAC valve block, as shown in Figure 24.

9. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT

DOWN and LEFT DOWN. Cables labeled with UP go on the same side as the
hydraulic hoses.

Advertising