7 electrical installation – NORAC UC4.5-BC-SC2 User Manual

Page 18

Advertising
background image



15

7 Electrical Installation

1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it

will be clearly visible and within easy reach of the operator.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the
Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to
facilitate the control panel mounting.
Another option is to purchase an adapter for the flexible panel mount that has a 3/8" NC
threaded stud on the end to bolt through an existing mount. These can be found at your
local outdoor store as a RAM mount part number RAM-B-236. (See

http://www.ram-

mount.com/

)

Figure 15: Cable Configurations: C01, C06, C10 and C13

2. Connect the UC4.5 power cable (C10) to the 16-pin connector on the back of the UC4.5

Control Panel in the cab. Connect C01 to the 4-pin connector on the back of the UC4.5
Control Panel. Cable tie C10 and C01 to the RAM mount to help provide strain relief.

3. The 3-pin AMP plug on C10B is connected to the auxiliary power connection in the sprayer

cab.

4. Connect C06 to C01 using the 2-way coupler (E12).

Ensure the UC4.5 Control Panel’s power is OFF for the remaining installation.

(Bottom of switch pressed IN).

5. Remove the electrical panel from the right-hand side of the sprayer and locate the access

hole on the top right hand side.

Advertising