6 hydraulic installation, 1 valve assembly – NORAC UC4+BC+RG6 User Manual

Page 23

Advertising
background image

20

4.6 H

YDRAULIC

I

NSTALLATION

This manual covers two styles of
hydraulics. Be sure to follow the
hydraulic sections that correspond to
the correct fitting style.

WARNING!

The hydraulic system creates very
high pressure. Before disconnecting
any hydraulic lines ensure all pressure

has been bled from the system.

When changing the boom hydraulic
hoses leave the booms in
TRANSPORT POSITION.

IMPORTANT:

Component failure due to oil
contamination is not covered under
the UC4+ Spray Height Control
system warranty. It is recommended
that a qualified technician does the

hydraulic installation.

4.6.1 Valve Assembly
1. On a clean surface remove all plastic

plugs from the NORAC hydraulic Valve
(V01) (Figure 19).

Figure 19: NORAC Valve Block

2. Install the male adapters (F07) on the

“P” and “T” ports and tighten to 18 ft-
lbs.

3. Install the orifices (F08) into the "B"

ports with the notch facing outward
as shown in Figure 20.

4. Install the male adapters (F07) into the

"B" ports and tighten to 18 ft-lbs.

5. Install the plugs (F08) into the "A" ports

and tighten to 18 ft-lbs.

Figure 20: Valve Block Assembly

Advertising
This manual is related to the following products: