4 electrical installation – NORAC UC4+BC+FT2 User Manual

Page 18

Advertising
background image

15

4.4 E

LECTRICAL

I

NSTALLATION

Figure 16: Cable Configurations: Rear of the sprayer

1. Route C11 to the rear of the sprayer,

in the vicinity of the valve block. Note
that the 16-pin AMP plug (P16)
provides the hitch connection.

2. Connect the 3-pin Shroud (S3) on C11

to the mating 3-pin Tower (T3B) on
C04.

3. Connect the 6-pin Shroud (S6A) on

C11 to the mating 6-pin Tower (T6B)
on C03.

4. Connect the manual override cable

(C12) to terminal T6A.

5. Connect the Deutsch connectors on

C12 to the Fast valve block, by using
the connector labels on the cable.

6. Install the 2-pin connectors from C03

onto each NORAC valve as shown in
Figure 17
.

7. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Advertising