Oakworks Paper Roll Holder for Treatment Tables User Manual

Powerline & seychelle, Paper roll holder installation, Akworks

Advertising
background image

Use masking tape to mark 2”

drilling depth.

Step 1

O

AKWORKS

®

PowerLine & Seychelle

paper roll holder

bracket (2)

screws (2)

wooden dowel (1)

R

Toll Free: 800.558.8850 Phone: 717.235.6807 www.oakworks.com

PAPER ROLL HOLDER INSTALLATION

Items required:

7/32” Dia. standard drill bit

Hand

drill

Masking

tape

Ruler

5/32” or 4mm Hex Key Wrench

Part no.MMINML0013 rev. O.18.10

2”

After table is set-up, select

position for first bracket to

be installed on the outside of

table leg on foot end of table.

Step 2

Slide bracket along bottom

edge of table side frame until

it meets with the existing bolt

head. Ensure the dowel rod

seat on the bracket is facing

inwards.

Step 3

Holding the bracket firmly,

drill the bracket mounting

hole until the masking tape

reaches the bracket.

Step 4

Using the supplied screw & your hex

key wrench, secure the paper roll holder

bracket into place. Repeat steps 3 thru 5 on

the other side of table.

Step 5

Part #61624 – Oakworks Paper Roll Holder Kit

Locate the wooden dowel & feed it thru

your paper roll. Place one end of the

wooden dowel in the hole located in the

paper roll holder bracket.

Step 6

To secure the wooden dowel on the

other side, pull out the paper roll

holder bracket slightly & insert the

wooden dowel into the hole.

Step 7

Advertising