Installation instructions – Oberon 1052-AP135 User Manual

Page 2

Advertising
background image

Installation Instructions

Model Number 1052-AP135

(877) 867-2312www.oberonwireless.com

Rev. 2A 6/5/14

Oberon, Inc. •••• 1315 South Allen Street •••• State College, PA 16801

Copyright 2013


Assembly Components:
- Ceiling enclosure Model 1052-AP135 assembly – 1 each
- 1” Trade size conduit connectors – 1 each
- Firestop Grommet – 1 each
- #8 – 32 screw – 4 each
- #6 – 32 screw – 4 each
- Support wire – 4 each
- Installation Instructions – 1 each
- Keys for access door lock – 2 each
If any of these items are missing, contact your Oberon representative.


Find a flat work surface to assemble the ceiling enclosure, access point and antenna(s) prior to mounting in ceiling.

Step 1 – Place the ceiling enclosure
assembly
on the work surface with the
keyed doorway unlocked. Remove hole
knock outs located on the outside edge of
the back box to install conduit connectors.
Install one conduit connector if using
P.O.E. or install 2 conduit connectors if
bringing in power and Ethernet and power
separately (Figure 1).





Figure 1








Step 2 – Install the mounting plate onto the mounting bracket using
the (4) # 4-40 screws. The tabs of the mounting plate should be
facing up toward the cutout on the bracket. Slide the access point
onto the mounting plate, locking the tabs to the underside of the
access point (Figure 2).



Figure 2

Page 2










Step 3 – The door assembly is completed by attaching the
previously

assembled

mounting

plate/access point

assembly to the enclosure door by securing it in place with
four (4) #8-32 hex nuts. Place the slotted holes in the
mounting plate/access point assembly over the studs
located on the bottom side of the door (NOTE: the
mounting plate can only be attached to the door in one
direction. If the slotted holes don’t match up with the studs
in the door, rotate the mounting plate 180°). Once the
mounting plate is positioned, secure it in place by installing
four (4) #8-32 hex nuts (Figure 3).





The assembled unit is now ready for ceiling installation.



Step 4 – Remove the ceiling tile and replace it with the completed access point enclosure assembly.



Step 5 – Use minimum 12-gauge support wire (included) to support the access point enclosure independently of the ceiling
grid. Attach one end of the wire to the support wire tabs located along the edge of the back box and the other end to a
permanent supporting structure within the ceiling such as a ceiling joist (Figure 4).



**IMPORTANT** - This is an important safety feature that could prevent human injury or damage to the access

point should the unit become dislodged from the ceiling.






Page 3

Figure 3

Advertising