PULSE ShowerSpas 1015 Makena User Manual

Makena model #1015, New construction/extensive remodel

Advertising
background image

Makena Model #1015


P

LEASE

R

EAD

T

HE

F

OLLOWING

I

NSTRUCTIONS

C

OMPLETELY

B

EFORE

B

EGINNING

!

Our goal is to ensure that your installation goes smoothly and safely. Please read these
safety instructions carefully and follow the recommendations for plumbing and
mounting. If, after reading this instruction manual, you determine you do not have
the necessary skills and/or tools, we then recommend a licensed plumbing
contractor complete the installation.


You will need the following tools:

Soft pencil or felt pen to mark tile
Tape Measure
Level
Drill (Preferably cordless)

A Reciprocating Saw w/metal cutting blade
(Sawzall®)
Channel Locks or adjustable wrench
¼”

Masonry Drill Bit

New Construction/Extensive Remodel

New Finished Wall Surface

1. Prior to sheetrock, stub-out ½” hot and cold supply lines beyond the finished wall

surface, 3” on center. The height of the Stub-outs is completely dependent upon the
desired mounting height of the Makena Showerspa. For a person 5’8” – 6’2” we
recommend the stub-outs to be 43” from the finished floor.

1

2. After the finished wall surface has been completed, make certain the water is completely

turned off to both hot & cold supply lines of the Shower. Connect the 90° male threaded
fittings to the stub-outs maintaining ¼” – ½” space between the fitting and finished wall.
The open end of the threaded male fitting should point down.

3. Mark the location of the holes for the top mounting bracket making sure the bracket is

level. For a person 5’8” – 6’2” tall, we recommend 64” from finished floor height

2

. To

locate bottom mounting bracket, measure the distance between top and bottom mounting
slots in the Showerspa. Use this measurement to position bottom bracket making sure
bottom bracket is plumb with the upper bracket. Before drilling holes for the brackets,
make certain the Showerspa will rest flat against finished wall surface at the desired
mounting height with the supply lines connected.

4. Drill ¼” holes through the wall surface using a masonry bit. Drill slowly through wall

surface to avoid cracking and chipping. Insert anchor and securely screw brackets to wall.
Before connecting hot and cold supply lines, mount the Showerspa on the wall, checking
the height, and making sure the Showerspa feels secure.

5. Connect hot and cold water supply lines to male threaded pipe, do not over-tighten.

Before mounting the Showerspa, check the fittings to make sure they are secure. Turn on
water and check for leaks. When fittings are leak-free mount Showerspa on wall.

6. Seal around the body of Showerspa with a bead of silicone.

1

The desired mounting height of the Showerspa determines the height of the ½” stub-outs. The stub-outs

must be located at a height allowing the supply lines to be connected and the body of the Showerspa to rest
flat against the finished wall.

2

This height may vary depending on several factors (i.e. location of supply lines, interference from

Showerspa plumbing, personal preference, etc.).

Advertising