Rev-A-Shelf 4WV-Series User Manual

20 min, Woven basket installation instructions, Part list

Advertising
background image

WOVEN BASKET INSTALLATION INSTRUCTIONS

ESTIMATED ASSEMBLY TIME:

20 MIN

CARE AND MAINTENANCE:

Clean basket and wood frame with a damp cloth and wipe parts

dry. machine wash liner in cold water with like colors.

2409 Plantside Dr., Jeffersontown, KY 40299

800.626.1126

www.rev-a-shelf.com

TOOLS REQUIRED:

1)

Measure the inside cabinet width (ICW) at desired height for wood rails.

2)

Measure the width of basket wood frame (BW).

3)

Subtract BW from ICW. Divide answer by 2. Subtract 1/16” from answer.

This will give you the dimension needed from bottom of groove to back of wood

rail (ICW-BW) ÷ 2 - 1/16”.

4)

Cut wood rails per steps 1-3.

5)

Place first cut rail in cabinet with front of rail against back of face frame (for

frameless cabinets, flush with front of cabinet.) at desired height. Secure the front

hole with proper size screw. (Screws not included due to variant in cabinet wall

thicknesses) (Make sure screw does not go through outside wall of cabinet).

Part list:

NOTE: SCREWS NOT INCLUDED DUE TO VARIANT SIZES IN CABINETS

(ICW-BW) ÷ 2 - 1/16”

Desired Height

of Rail

Inside

Cabinet

Width

(ICW)

Basket

Width

(BW)

Bottom of groove

Back of w

ood r

ail

8)

Install second rail on opposite side of cabinet per steps 5-6 at height

location from step 7.

7)

Measure from floor of cabinet to bottom of installed rail.

6)

Make sure rail is level, then secure to cabinet with screws at

remaining hole locations.

9)

Slide in basket.

I-4WV-TRI-1013

Bottom of

rail to floor of

cabinet

Advertising