Reznor XBWS Option - Installation - Vertical Supply/Return User Manual

Caution, Warning

Advertising
background image

PAGE 1

I - Ship ping and Pack ing List
Package contains:

1 — Energy Recovery Ventilator Assembly

I I - Ship ping Dam age
Check unit for shipping damage. Receiving party should
contact last carrier immediately if shipping damage is
found.

III - Gen eral
These instructions are intended as a general guide and do
not supersede local codes in any way. Authorities having
jurisdiction should be consulted before installation.

IV - Re quire ments
When installed, the unit must be electrically wired and
grounded in accordance with local codes or, in absence of
local codes, with the current National Electric Code,
ANSI/NFPA No. 70.

V - Ap pli ca tion

These Energy Recovery Ventilators (ERV) are used in a
down discharge manner equipped with field provided
balancing damper assembly
through the roof. A roof
curb must be provided to Rooftop Systems specifications.
These wheels conserve energy by mixing warmer air with
cooler air in the following manner:

Re cov ery Wheel Mode
The Recovery Wheel mode is accomplished by two
blowers providing continuous exhaust of stale indoor air
and replacement by equal amount of outdoor air. Energy
recovery is achieved by slowly rotating the energy
recovery wheel within the cassette frame work. In winter,
the ERV adsorbs heat and moisture from the exhaust air
stream during one half of a complete rotation and gives
them back to the cold, drier intake air supply during the
other half rotation. In summer, the process is automatically
reversed. Heat and moisture are absorbed from incoming
fresh air supply and transferred to the exhaust air stream.
This process allows outdoor air ventilation rates to be
increased by factors of three or more without additional
energy penalty or increase in size of heating or air
conditioning systems.

VI - Rig ging Unit For Lift ing
1.

Maximum weight of unit is — Varies per Series
{300-1200 Lbs.} (Crated)

2.

Remove crating.

3.

All panels must be in place for rigging.

4.

Remove hood assemblies from door marked filter
access.

5.

Place 2" filter in filter rack and replace filter access
door.

6.

Duct work should be installed into roof curb before
installing ERV on curb.

7.

Roof curb gasket must be applied to all top surfaces of
the curb. (Refer to roof curb installation instruction.)

8.

Forklift channels must be removed from the base of
ERV before setting unit on curb. See Figure 1.

9.

Position unit on roof curb and provide service access
to ERV control access door and wheel.

CAUTION

Danger of sharp metallic edges. Can cause injury.
Take care when servicing unit to avoid accidental
contact with sharp edges.

WARNING

Electric shock hazard. Can cause injury
or death. Before attempting to perform
any service or maintenance, turn the
e l e c t r i c a l p o w e r t o u n i t O F F a t
disconnect switch(es). Unit may have
multiple power supplies.

FIGURE 1

FORKLIFT CHANNELS

INSTALLATION INSTRUCTIONS

EN ERGY RE COV ERY VEN TI LA TOR

Applies to Model XBWS when used with Option AQ21

Vertical Supply and Return Air

INSTALLATION INSTRUCTIONS FOR ROOFTOP STAND ALONE

ENERGY RECOVERY UNIT IN VERTICAL (UP/DOWN) AIRFLOW DESIGN

FORM RZ-NA-I-XBWS-AQ21

MAY 29, 2014

SUPERCEDES 09-27-13

DXX-2ZERV

Energy recovery COMPONENT certified
to the AHRI Air-to-Air Energy Recovery
Ventilation Equipment Certification
Program in accordance w ith AHRI
Standard 1060-2000. Actual performance
in packaged equipment may vary.

ETL Certified per UL 1995
and CSA 22.2

Advertising