Models rdh, reh, rhh, and rxh, Typical layout of assembled curb – Reznor ADFH Option - Installation - Roof Curbs Assembly User Manual

Page 21

Advertising
background image

Form I-OPT-C, P/N 132900 R17, Page 21

Model RHH Configuration * (NOTE: Model RHH requires a roof curb.)

Option Code

RHH

Pkg P/N Curb End (Front & Rear) Assy Curb Side Assy

Model RHH Basic Unit ONLY

CJ8Q

130/180 263910

(2) 261546

(2) 263425

260

263911

(2) 261548

(2) 263425

350

263912

(2) 261549

(2) 263425

Model RHH PLUS 1 optional module - either Downturn Discharge Plenum (AQ5 or

AQ8); OR Mixing Box (MXB1) with horizontal discharge; OR Cooling Coil Cabinet

without Reheat (AU5 or AU6) with horizontal discharge

CJ8R

130/180 263913

(2) 261546

(2) 263426

260

263914

(2) 261548

(2) 263426

350

263915

(2) 261549

(2) 263426

Model RHH PLUS 2 optional modules - either Down Discharge (AQ 5 or AQ8) AND

Mixing Box OR Cooling Coil Cabinet without Reheat (AU 5 or 6); OR Mixing Box

AND Cooling Coil Cabinet without Reheat (AU 5 or 6) with horizontal discharge

CJ8S

130/180 263916

(2) 261546

(2) 263427

260

263917

(2) 261548

(2) 263427

350

263918

(2) 261549

(2) 263427

Model RHH PLUS 3 optional modules - either Down Discharge Plenum (AQ5 or AQ8)

AND Mixing Box (MXB1) AND Cooling Coil Cabinet without Reheat (AU5 or AU6)

CJ8T

130/180 263919

(2) 261546

(2) 263428

260

263920

(2) 261548

(2) 263428

350

263921

(2) 261549

(2) 263428

Model RHH PLUS 1 optional module - Cooling Coil Cabinet with Reheat (AU7) with

horizontal discharge

CJ8U

130/180 263922

(2) 261546

(2) 263429

260

263923

(2) 261548

(2) 263429

350

263924

(2) 261549

(2) 263429

Model RHH PLUS 2 optional modules - Cooling Coil Cabinet with Reheat (AU7)

AND Down Discharge Plenum (AQ5 or AQ8) OR Mixing Box (MXB1) with horizontal

discharge

CJ8V

130/180 263925

(2) 261546

(2) 263430

260

263926

(2) 261548

(2) 263430

350

263927

(2) 261549

(2) 263430

Model RHH PLUS 3 optional modules - Cooling Coil Cabinet with Reheat (AU7) AND

Down Discharge Plenum (AQ5 or AQ8) AND Mixing Box (MXB1)

CJ8W

130/180 263928

(2) 261546

(2) 263431

260

263929

(2) 261548

(2) 263431

350

263930

(2) 261549

(2) 263431

Installation Instructions

for Roof Curbs for

PreevA

®

Models RDH,

REH, RHH, and RXH

1. Refer to the curb assembly drawings (FIGURE 7A) and the curb drawing and

dimensions (

FIGURE 7B and FIGURE 7C).

2. Position curb end rails and curb side rails as shown in the typical layout and in

FIGURE 7A. Join the corners as illustrated in the corner detail.

3. Check the assembly for squareness. The curb must be adjusted so that the

diagonal measurements are equal within a tolerance of ±1/8” (±3mm).

FIGURE 7A - Curb Assembly for

Models RDH, REH, RHH, and RXH

16”

(406mm)

Typical

Layout of

Assembled Curb

16”

(406mm)

1-7/8”(48mm)

(102mm)

2 x 6 Wood

Nailer

1-1/2 x 3 lb

Fiberglass

Flashed by the

installer (flashing

must be under

lip of curb)

Lag Screw

and Washer

Cap

Screws

Curb

Section

Corner Detail

4. Level the roof curb. To ensure a good weatherproof

seal between the unit curb cap and the roof curb, the

roof curb must be leveled in both directions with no

twist end to end. Shim as required and secure curb to

roof deck before proceeding with flashing (See Curb

Detail in

FIGURE 7B).

5. Install field-supplied flashing.

6. Before placing the unit into position, apply furnished

1/4” x 1-1/4” foam sealant tape to the top surface of the

curb, making good butt joints at corners. The unit must

be sealed to the curb to prevent water leakage into the

curb area due to blown rain and capillary action.

Unit

Bottom

MUST be sealed between

curb cap and roof curb

Unit

Base

Wood

Nailer

Insulation

6-1/4”

(159mm)

Counter Flashing

(by installer)

Roofing Felts and Cant

Strip (by installer)

Weld, bolt or lag screw curb to deck structure.

16”

(406mm)

FIGURE 7B -

Curb and Curb

Cap Detail -

Models RDH,

REH, RHH,

and RXH

IMPORTANT Installation Notes:

Model RHH - The area enclosed by the roof curb MUST be left open.

Models RDH, RXH, REH - The area enclosed by the roof curb must comply with clearance to combustible materials.

If roof is constructed of combustible materials, the area within the curb must be either ventilated, left open, or covered

with non-combustible material which has an "R" value of at least 5.0. If the area within the curb is left open, higher

radiated sound levels may result.
All Models - To minimize sound transfer and prevent air and water leakage, the top surface of the curb MUST be sealed.

Advertising