Reznor BE Option - Installation - Vertical Louvers User Manual

Option cd1 vertical louvers, Applies to: models f, fe, b, and be

Advertising
background image

Form I-F/B-VL, Mfg #97925 Rev 3, Page 1

INSTALLATION FORM RZ/NA I-F/B-VL

Obsoletes Form 434/436-VL (Version A.2)

OPTION CD1

25-50

75

100

125

130

165

200

250-300

400

Vertical Louvers

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Qty

P/N

Option Package P/N

98500

98501

98502

136863

98503

98504

98505

98506

98507

Top and Bottom Mem bers

2

97852

2

97853

2

97854

2

97856

2

97854

2

97856

2

97856

2

97857

2

97858

Vertical Louvers

4

95937

4

95937

4

95937

6

95937

4

95938

6

95938

6

95938

8

95938 10 95938

Screws 12 11813 12 11813 12 11813 16

11813

12 11813 16 11813 16 11813 20 11813 28 11813

WARNING: Improper installation, adjustment,

alteration, service, or maintenance can cause

property damage, injury or death. Read the

installation, operation, and maintenance

instructions thoroughly before installing or

servicing this equipment.

INSTALLATION INSTRUCTIONS

Installation should be done by a qualified agency in accordance with the

instructions on this sheet and in compliance with all codes and require-

ments of authorities having jurisdiction.
Tools Required: 5/16" Nut Driver
1. Assemble the Louvers - Assemble vertical louvers to the top and

bottom members using the sheetmetal screws provided (See Figure

1).

a. Vertical louver edges should extend beyond the front outer end of

the louver top and bottom members.

®

OPTION CD1

VERTICAL LOUVERS

APPLIES TO:

Models F, FE, B, and BE

The vertical louver option packages include:

IMPORTANT NOTE: On fan models (Models F and FE), do not install vertical louvers in combination with Option CD3, Downturn Nozzle with 50

o

-90

o

Variable Air

Deflection Range (formerly identified as a 60

o

nozzle).

CAUTION: To avoid getting burned,

adjust louvers while heater is not in

operation. If louvers are adjusted

while heater is in operation, wear

protective gloves.

Figure 1 - Installing Optional

Vertical Louvers

HAZARD INTENSITY LEVELS

1. DANGER: Failure to comply will result in severe personal

injury or death and/or property damage.

2. WARNING: Failure to comply could result in severe personal

injury or death and/or property damage.

3. CAUTION: Failure to comply could result in minor personal

injury and/or property damage.

b. Stops are designed so that the right half of the louvers turn right

and the left half of the louvers turn left.

2. If the heater is installed, for your safety, turn off the gas and

the electrical power before installing the assembled vertical

louvers.

3. Prepare Heater Front Panels (Top and Bottom) -- Holes re-

quired in the top and bottom front panels are punched at the fac-

tory. The holes in the bottom front panel have screws inserted.

Remove the factory-installed screws from the bottom front panel

(save the screws to use in attaching the louver assembly).

4. Install the Louver Assembly -- Using the sheetmetal screws, at-

tach the top member of the vertical louver assembly to the top front

panel of the heater and the bottom member of the vertical louver

assembly to the bottom front panel.

5. Adjust the horizontal and vertical louvers to provide the desired air

direction. See CAUTION below.

6. Turn on the electric and the gas. Relight by following the lighting

instructions on the heater. Check for proper operation.

(800) 695-1901, www.RezSpec.com

©2014 Reznor, LLC. All rights reserved.

Printed in the U.S.A.

MANUFACTURER OF GAS, OIL, ELECTRIC HEATING AND VENTILATING SYSTEMS

Trademark Note: Reznor

®

is registered in the United States and other countries.

0514 POD OG Form I-F/B-VL (Version 0.1)

Advertising