Installation / performance check list gas system, Refrigeration system, Electrical system – Reznor R6GF Unit Installation Manual User Manual

Page 36: Venting system

Advertising
background image

INSTALLATION / PERFORMANCE CHECK LIST

GAS SYSTEM

Gas

Type: (circle one)

Natural

Gas

Propane

Gas pipe connections leak-tested?

YES

NO

Gas Line Pressure:

____________________________ (in - W.C.)

Is there adequate fresh air supply
for combustion and ventilation?

YES

NO

Installation Altitude:

______________________________ (FT.)

Deration Percentage:

______________________________ (%)

Furnace Input:

_________________________________(Btuh)

Supply Air Temperature:

__________________________ (° F)

Return Air Temperature:

__________________________ (° F)

Temperature Rise:

_______________________________ (° F)

During Furnace Operation:

Low fire manifold pressure:

______________________ (in - W.C.)

High fire manifold pressure:

______________________ (in - W.C.)

REFRIGERATION SYSTEM

Was unit given 24 hr warm up period
for crankcase heaters?

YES

NO

Stage-1 Liquid Pressure (high side) ________________________

Stage-1 Suction Pressure (low side) ________________________

Stage-2 Liquid Pressure (high side) ________________________

Stage-2 Suction Pressure (low side) ________________________

INSTALLATION ADDRESS:

CITY ________________________

STATE ________________

UNIT MODEL # ________________________________________

UNIT SERIAL # _______________________________________

Unit Installed Minimum clearances per
Figure 1 (page 5)?

YES

NO

INSTALLER NAME:

CITY _______________________

STATE ________________

Has the owner’s information been
reviewed with the customer?

YES

NO

Has the Literature Package been left
with the unit?

YES

NO

ELECTRICAL SYSTEM

Electrical connections tight?

YES

NO

Line voltage polarity correct?

YES

NO

Rated Voltage:

___________________________________ VOLTS

L1-L2 Volts:

_____________________________________ VOLTS

Has the thermostat been calibrated?

YES

NO

Is the thermostat level?

YES

NO

Is the heat anticipator setting correct?

YES

NO

VENTING SYSTEM

Is the vent hood installed?

YES

NO

Is vent hood free from restrictions

YES

NO

Filter(s) secured in place?

YES

NO

Filter(s) clean?

YES

NO

Specifications & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (03/13)

7094520 (Replaces 7093420)

IMPORTANT - This product has been designed and manufactured to meet ENERGY STAR criteria for energy efficiency.

However, proper refrigerant charge and proper air flow are critical to achieve rated capacity and efficiency. Installation of

this product should follow the manufacturer’s refrigerant charging and air flow instructions. Failure to confirm proper charge

and airflow may reduce energy efficiency and shorten equipment life.

Advertising