Reznor R6GI Option - Installation - Roof Curb - Light Commercial User Manual

Installation instructions

Advertising
background image

Step 1:
Curb Package is shown as shipped with easy to
identify part numbers on all sides. Cut shipping
bands and remove Hardware, Gasket Material,
4 Duct Supports, and 3 Insulated Pans.

Step 2:
Layout the curb pieces before assembly to
insure that all the necessary pieces are
included.

(B)

(C)

(E)

(A)

(G)

(A)

(F)

(H)

(D)

(B)

(G)

1)

2 ea. Curb Long Sides - 49 ½" Long (A)

2)

2 ea. Curb Short Sides - 41 ½" Long (B)

3)

1 ea. Horizontal Duct Support - 46 ½" Long (C)

4)

1 ea. Vertical Duct Support - 21" Long (D)

5)

1 ea. Vertical Hat Section - 19" Long (E)

6)

1 ea. Horizontal Hat Section - 25" Long (F)

7)

2 ea. Insulated Pan - 46 ½" Long (G)

8)

1 ea. Insulated Pan - 21” Long (H)

9)

1 ea. Hardware Package Includes:

4 ea. "Hinge" Pins

3

16

"

12 ea. Hex Washers screws #10 x ½"

10)

2 ea. Gasket ¾" x 1 ¼" x 14' (28 ft. total)

U.S. PATENT 5148647

FORM# 593A- 0514 (593A- 0808)

INSTALLATION INSTRUCTIONS FOR

547830A / 547831A / 547850A / 547851A

ROOF CURBS USED WITH R4GM-072, P6SD/P8SE,

Q6SD/Q8SE, R6G(D,F,I), R8G(D,E), R8HE 024-060 UNITS

INSTALLATION

INSTRUCTIONS

This Roof Curb is NRCA approved and is constructed of 18 gauge galvanized steel with a full perimeter 1" x 4" wood nailer
strip. The curb is designed to be used with the Cooling, Gas Electric, and Heat Pump Models. The curb is shipped with the
following parts, See Figure 2:

Fig ure 1

Fig ure 2

Important! Notice to Installer
If setting this curb for use with Nordyne 95% AFUE R8HE/PPG3HE Series condensing style package gas/electric
unit, routing and securement of the gas heat exchanger condensate drain line must be determined and installed
prior to setting the unit on the curb.

It is recommended to drill a 1.00”-1.25” diameter hole through the roof below the rectangular opening located in outer close
off panel (G), approximately 15” in from the short side of the curb and 1”-2” in from the long side of the curb. (See Figure 7)
If drilling a hole is not an option, routing of the condensate drain hose over to the duct passage opening with enough slope
is acceptable as long as drain line is secured to curb and duct, ensuring no kinks or traps can form between the collector
box drain or interior of the building. Leave a minimum of 24” drain line extending out the top of front close off panel (G) for
passage through unit bottom and connection to unit drain when unit is being set. See unit or Condensate/Vent Drain Kit
(P/N-922485) instructions for completion of the drain connection. It is recommended no non-serviceable connections are
introduced in the drain line between unit drain connection and an accessible area within the building interior. Securement
of the drain line to the inside surface of the roof curb is acceptable and should be made in the wood nailer area ( top 3.5”) to
avoid possible leaks or penetrations to roofing materials.