Installation instructions – Santec 8864NU User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTIONS

PAGE 02

1- Take the ring post with the ring off the box.
Place the trim parts against the assigned wall location.
Mark the ring post flange position and remove the trim.

2- Using the mounting hardware post as reference, mark the screw hole positions
in the center of the post flange mark on the wall.

2a-

INSTALLING ON WOODEN SURFACE

- For wooden surface, the mounting hardware post can be secured by
screwing the screws directly into the wall.

2b-

IF INSTALLING ON A DRYWALL

- Using a drill, pre-drill holes for the toggles.
- Fold the toggle’s leg and insert it into the wall.
- The mounting hardware post can be secured by screwing the screws
into the toggles.

2c-

IF INSTALLING ON A SOLID/HARD SURFACE

- Measure the dimension carefully.
- Using a drill, pre-drill the holes.
- Secure the mounting hardware post by screwing the screws into
the wall.

3- Using the Allen key provided, loosen the ring post’s set screw.
Slip the ring post onto the mounting hardware post.
Align the ring post and secure it by tightening the set screw.

4- Check the ring post to make sure it is firmly secured.
If not, tighten the set screw with the Allen key.

Santec Inc.

3501 Challenger Street, Torrance, CA 90503
Tel: (310) 542-0063 Fax (310) 542-5681
www.santecfaucet.com

05/03

WOODEN SURFACE

DRY WALL SURFACE

HARD SURFACE

WALL

8864NU _ _

Advertising