Installation instructions, Illustration b, Description – Santec 9935CU-TM User Manual

Page 2: Installation

Advertising
background image

DESCRIPTION

This product is precision engineered to provide satisfactory performance provided it is installed and operated in

accordance with our recommendations contained in this manual. In order to fully enjoy the comfort, safety and the

reliability of your pressure balancing valve, be certain to familiarize yourself with the contents of this manual.

SPECIFICATIONS AND DIMENSIONS

Minimum operating pressure 20 psi

Maximum operating pressure 145 psi

Maximum test pressure 500 psi

Hot and cold water inlets ½" IPS

Shower outlet ½" IPS

Flow capacity 5 USGPM @ 50 psi

Finished wall adjustment : see Illustration B

INSTALLATION

NOTE: Failure to follow these instructions may cause damage or improper operations and nullify the warranty.

ROUGH IN

- Make sure the water supplies are off.

- Remove all the trim items (plate, handle and flange) before installation.

- Secure the valve firmly against the stud. Make sure the ½" shower outlet is in the up position.

- Make sure to flush or raise grouting on the tiled wall surface.

- Adjust the All Thread depth against the Teflon Washer and Limit Stop.

Screw the All Thread against the Teflon washer until it is pressured gently against each other.

- Tighten firmly the Lock Nut against the Lock Plate.

- Position the valve using the dimension shown in the illustration B.

INSTALLATION INSTRUCTIONS

3. 00”

All Thread

Stem

Lock Nut

Lock Plate

Trim Plate

S

T

Diverter Rod

Diverter Knob

Diverter Rod O-Ring

ILLUSTRATION B

PAGE 02

Pressure Balanced Tub/Shower

WALL LINE

78"

(1981 mm)

FLOOR

LINE

½”

½”

33"

LOCK NUT

LEVER PLUG O-RING

PLASTIC WASHER

SET SCREW

VENT PLUG

Advertising