Lynx 16 – Slant/Fin LX-150 User Manual

Page 16

Advertising
background image

Lynx

16

VENT/AIR INTAKE TERMINATION FOR PVC/CPVC, OR
POLYPROPYLENE VENTING INSTALLATION (P# 840802000)

This termination is designed specifically for 3” diameter PVC,
CPVC Schedule 40 or polypropylene pipe to be used as the
vent and air intake piping material, only. It can be used on a
combustible wall, provided the 1” minimum clearance of the
vent pipe to any combustible surface is maintained.

1. Termination must be installed horizontally.

2. Refer to Figure 13a or 13c for installation details.

3. Wall thickness should be 3” to 18” thick.

4. Follow instruction for “vent termination location and

clearances” explained on page 10.

5. Cut a rectangular opening with the following dimensions in

the wall.
Height: 5

1

4

Width: 12

3

4

6. From outside of the wall, install outside termination plate

using 4 screws. Make sure the louvers are at right side.
Seal the plate perimeter with silicon.

7. Apply a bead of silicon around the outer surface of the out

side termination plate air intake collar, about 1/2” from the
edge. This will seal the air intake pipe to the air intake
collar, in step #9.

8. From inside, install the inside termination plate, using 4

screws. Make sure that the holes for the vent and air intake
pipe visually line up with the vent passage hole and air
intake collar on the outside termination plate.

9. Cut the PVC or CPVC air intake pipe to the proper

dimension to fit onto the air intake collar of the terminal.
Slide the air intake pipe through the inside termination
plate and onto the air intake collar, where the sealant was
pre-applied in Step #7.

10. Cut the vent pipe so that it will extend out at least 2" from

outside termination plate and 2" from the inside
termination plate.

11. Cement a 3” diameter PVC or CPVC coupling onto the

PVC or CPVC vent pipe, and install stainless steel
screen into the coupling (supplied with the boiler).

12. From outside the wall, insert the bare end of the PVC or

CPVC vent pipe through the outside and inside terminal
plates, until the coupling is flush with the outside wall plate.

13. From inside, proceed with the air intake and vent pipe

installation. Follow the proper PVC/CPVC assembly
practices specified on page 8, and venting system
restrictions specified on page 8 of this manual.

Note: For venting with polypropylene pipe, special gasket
(P# 813005000) must be added to inside and outside plate
as shown on figure 13c.

VENT/AIR INTAKE TERMINATION FOR STAINLESS STEEL
VENTING INSTALLATION (P# 840804000)

This termination is designed specifically for Heat-Fab Saf-T
vent 3” diameter stainless steel venting system to be used as
the vent, and 3” diameter PVC or CPVC schedule 40 pipe to
be used as the air intake piping material, only. It can be used
on a combustible wall, provided a length of 4” diameter galva-
nized pipe is installed as a thimble around the vent pipe, for the
wall passage.

1. Termination must be installed horizontally.

2. Refer to Figure 13b for installation details.

3. Wall thickness should be 3” to 12” thick.

4. Follow instruction for “vent termination location and

clearances” explained on page 10.

5. Cut a rectangular opening with the following dimensions in

the wall.
Height: 5

1

4

Width: 12

3

4

6. From outside of the wall, install outside termination plate

using 4 screws. Make sure the louvers are at right side.
Seal the plate perimeter with silicon.

7. Apply a bead of silicon around the outer surface of the

outside termination plate air intake collar, about 1/2” from
the edge. This will seal the air intake pipe to the air intake
collar, in step #11.

8. For combustible wall a 4” galvanized pipe must be used as

a wall thimble.The length of the 4” galvanized pipe should
be approximately 1” shorter than the wall thickness.

9. From inside the building, fit galvanized pipe over 4” collar of

the outside plate.

10. From inside, install inside termination plate using 4 screws.

Make sure the 4” collar on the plate, penetrated into the
galvanized pipe.

11. Cut the PVC or CPVC air intake pipe to the proper

dimension to fit onto the air intake collar of the terminal.
Slide the air intake pipe through the inside termination
plate and onto the air intake collar, where the sealant was
pre-applied in Step #7.

12. Assemble and seal straight screened termination to the slip

joint connector.

13. From outside of the building, insert vent pipe (slip joint

connector and termination assembly) through the 3” holes
of the outside and inside termination plate.

14. From inside, proceed with air intake and vent pipe

installation. Follow vent manufacturer’s instructions and
restrictions specified on page 8 of this manual.

Advertising
This manual is related to the following products: