StarTech.com 4POSTRACK12U User Manual

Page 6

Advertising
background image

Instruction Manual

3

2. Using two of the Beams assembled in the previous step, line up one set of Left

and Right Vertical Rails, followed by the Base and Top Bracket pieces and fasten as

shown.

NOTE: In order to ensure all of the screw holes will line up easily, it is recommended

to hand-tighten the nuts through the entire assembly process, and then fully

tighten once all bolts have been inserted.

3. Using the remaining two Beams assembled in step 1, line up the other set of Left

and Right Vertical Rails and fasten them to the Base and Top Brackets as shown.

11

11

10

10

Assembled B

eam

Assembled B

eam

Assembled B

eam

Assembled B

eam

Advertising