Install the header bracket, Installation step 2 – Craftsman 13953985 User Manual

Page 14

Advertising
background image

Lag Screws
5/16"x9x1-5/8"

Vertical Centerline

– Finished Ceiling –

Door
Spring

Header Wall

UP

Ceiling Mounting Holes

6" (15 cm) Maximum

Header

Bracket

Vertical
Centerline

Garage Door

14

INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements. Do not install the header bracket
over drywall. If installing into masonry, use
concrete anchors (not provided).

WALL HEADER BRACKET INSTALLATION

• Center the bracket on the vertical centerline with

the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).

• Mark the vertical set of bracket holes. Drill 3/16"

pilot holes and fasten the bracket securely to a
structural support with the hardware provided.

CEILING HEADER BRACKET INSTALLATION

• Extend the vertical centerline onto the ceiling as

shown.

• Center the bracket on the vertical mark, no more

than 6" (15 cm) from the wall. Make sure the arrow
is pointing away from the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.

• Mark the side holes. Drill 3/16" pilot holes and

fasten bracket securely to a structural support with
the hardware provided.

Lag Screw
5/16"-9x1-5/8"

HARDWARE SHOWN ACTUAL SIZE

UP

Wall Mount

Optional
Mounting Holes

Lag Screws
5/16"x9x1-5/8"

Highest Point of
Garage Door Travel

Vertical
Centerline

Header
Wall

Garage
Door

Door Spring

2x4
Structural
Support

Vertical
Centerline

Header

Bracket

Advertising